2024年9月26日发(作者:中式家装图片大全 效果图)

INSTALLATION INSTRUCTIONS

安装说明书

PIVOT, SCREEN, 1D1P (ON WALL), 8mm

开门淋浴房,一字型,一固一活(上墙),8mm

K-81017T-FM-SHP

SKYLINE 诗乐

BEFORE YOU BEGIN

• All information is based on the latest product information

available at the time of publication. Kohler China Ltd.

reserves the right to make changes in product

characteristics, packaging, or availability at any time

without notice.

• These instructions contain important care, cleaning, and

warranty information-please leave these instructions for

the consumer.

• Make sure that the bath and the finished wall material are

completely and correctly installed prior to installing your

shower door. Prepare waterproof layer to wall and floor of

the showering area. It is not allowed for any presence of

electric switches and sockets. Make sure the floor drain

runs smoothly.

• Before starting the door installation, lay out and identify all

the parts. Use the exploded view illustrated on page 2 for

reference.

• For the installation method of customized shower with

different dimensions, please refer to this instructions.

• The product complies with QB 2584-2007.

CAUTION: Risk of injury or product damage.

Tempered glass cannot be cut, drilled or knocked by

hard object. Make sure corner area of the glass

refraining from knocking so as to cause personal injury

due to broken glass.

ATTENTION: Please install this door on Kohler receptors or

curbs(Not included). If the curb is not Kohler-branded, please

note its top width should be more than 80mm.

IMPORTANT: The shower door requires a flat vertical finished

wall. The squareness of the wall is recommended no more

than 3 mm/m. KOHLER Company won't take responsibility of

the installation quality.

安装之前

• 说明书中所有的资料是按最新出版的产品资料编写而成。

科勒中国有限公司保留任何时候无须通知即可改变产品特

性、包装或产品可供类型的权利。

• 说明书包括重要的安装、清洁及保养方面的内容,请把这

些资料交给用户阅读,保管。

• 确保在安装淋浴房之前已经完整正确地安装了浴室和完工

墙面材料。淋浴区墙地面应做防水处理,并不得布置有电

器开关、插座。确保地面排水通畅。

• 在进行淋浴房安装之前,请拿出、排列并确认所有的零部

件。请参考第 2 页上所示的分解图。

• 对尺寸与本标准产品不同的定制淋浴房,参照本说明书进

行安装。

• 本产品符合 QB 2584-2007。

警告:可能有人员伤害或者产品损坏的危险。

钢化玻璃不能进行切割,钻孔或硬物敲击。搬移或安装

过程中,小心确保玻璃边、角部位不受撞击,以防爆裂

伤人。

建议:将本产品安装在科勒淋浴盆或挡水条上(需另行购买)。

如自备挡水条,建议顶面宽度尺寸大于 80mm。

重要事项:淋浴房需要安装在平坦垂直的墙面上。墙面的垂直度

推荐在正负 3mm/m 以内。如果超出此范围,科勒公司将不保证

淋浴房的完美使用。

ROUGHING-IN

Do not use the enclosure for at least 24 hours.

安装后 24 小时内请勿使用淋浴房。

尺寸图

Unit: mm

单位:毫米

H

H

24hrs

B

1

5

7

5

3

9

B

55

10

SKU

K-81017T

B

900-1600

H

1850-2000

ZHONGSHAN KOHLER SHOWER CO., LTD. NO13-1, XINGYE ROAD, ZHONGSHAN TORCH

DEVELOPMENT ZONE, ZHONGSHAN, GUANGDONG, CHINA POST CODE: 528437

中山科勒卫浴有限公司 广东省中山市中山火炬开发区兴业路 13-1 号 邮编:528437

1288024-T01-A

-1-

© Copyright Kohler China Investment Co., Ltd. 2017

© 版权为科勒(中国)投资有限公司所有 2017

PivotClampAssy,

SkylinePivot

诗乐开门转轴夹组件

StraightMageticSeal45

°

磁条

USeal,SkylineSliding

诗乐 U 型保护胶条

GlassShellAssy

玻璃支撑架组件

ClipAssy,SkylinePivot

诗乐顶夹组件

TopPivotPinAssy

上轴座夹组件

TopCover-A,Skyline

诗乐铝材顶内盖

TopCover-B,Skyline

诗乐铝材顶外盖

Wall,SkylineSliding

诗乐移门墙材

WallJamb,SkylinePivot

诗乐开门竖材

DoorGlass,SkylinePivot

诗乐开门门玻

InsertSeal,6mm

单边胶条

InsertSeal,SkylinePivot

诗乐开门嵌入挡水胶条

PanelGlass,SkylinePivot

诗乐开门固玻

TwistLockJambMoulding,

Assy,Skyline

诗乐联墙组件

Screw,GB/T845ST3.5X40

盘头自攻螺钉

BottomFixedBlockCap

下固定块盖子

BottomFixedBlockBody

下固定块

Rail,Screen,Skyline

诗乐开门横梁

DoubleMetalHandle,

Skyline

诗乐把手

MilanoBottomSeal,Milano

米兰诺门底防水胶条

LimitSwitchAssy

防撞组件

BottomPivotPinAssy

下轴座夹组件

X2

X2

X2

X1

X2

X1

X1

X1

X2

X1

X1

WallJamb,SkylinePivot 诗乐开门竖材

Wall,SkylineSliding 诗乐移门墙材

Rail,Screen,Skyline 诗乐开门横梁

InsertSeal,SkylinePivot 诗乐开门嵌入挡水胶条

StraightMageticSeal45° 磁条

SideSeal,Milano 米兰诺侧边防水胶条

MilanoBottomSeal,Milano 米兰诺门底防水胶条

InsertSeal,6mm 单边胶条

USeal,SkylineSliding 诗乐U型保护胶条

DoubleMetalHandle,Skyline 诗乐把手

GlassShellAssy 玻璃支撑架组件

X1

X1

X1

X1

X1

X1

X2

X2

X2

X1

LimitSwitchAssy 防撞组件

BottomPivotPinAssy 下轴座夹组件

TopPivotPinAssy 上轴座夹组件

PinWasher 轴套

BottomFixedBlockCap 下固定块盖子

BottomFixedBlockBody 下固定块

TopCover-B,Skyline 诗乐铝材顶外盖

TopCover-A,Skyline 诗乐铝材顶内盖

PivotClampAssy,SkylinePivot 诗乐开门转轴夹组件

ClipAssy,SkylinePivot 诗乐顶夹组件

X16

PanScrewST3.5X40 圆头螺丝ST3.5X40

X9

X8

X1

X1

CskScrewST3.5X12 沉头螺丝ST3.5X12

HollowWallAnchor,Nylon 膨胀套

ScrewKey3mm 内六角扳手

ScrewKey4mm 内六角扳手

X10

Twist Lock Jamb Moulding, Assy, Skyline 诗乐联墙组件

Tools Required/所需工具

Pencil

铅笔

Masonry Drill &

6mm Drill Bit

冲击钻以及

6mm 冲击钻头

Measuring Tape

卷尺

Safety Goggles

护目镜

Hammer

锤子

5mm Allen Key

5mm 六角扳手

Level

水平仪

Phillips Screwdriver

十字螺丝刀

Caulk Gun

硅胶枪

Knife

刀片

2.5mm Allen Key

2.5mm 六角扳手

1288024-T01-A

-2-

INSTALLATION

Mark the wall 10mm infrom the front edge of the tray.

从挡水台边缘向内偏10mm。

安装

Fix wall jambs. One is fixed on the wall.

The other is not fixed on the wall after the holes are drilled.

固定上墙材,其中一支固定在墙上;

另一支在墙上钻出相应孔位后,不固定在墙上。

6mm

0mm

The wall jamb must

be kept vertical.

上墙材必须垂直。

0mm

0mm

IMPORTANT:

Tray MUST be level

along front edge.

重要:

底盘必须水平。

The wall jamb must

be kept vertical.

上墙材必须垂直。

1

0

m

m

STEP

1

STEP

2

Fix the top and bottom frames on the wall jamb.

将上下横梁固定在边立柱上。

Insert the unfixed wall jamb into the frame. Then insert the whole wall jamb

and fix the unfixed wall jamb.

将未固定在墙上的墙材插入框架,然后整体插入上墙材,再固定未固定的墙材。

Inside

淋浴房内侧

Note: Before fixing top and bottom

frames, make sure wall and wall

jamb is properly connected.

注意:固定上下横梁之前必须检查

竖材与墙材连接件是否组装好以及

方向。

Outside

淋浴房外侧

A

A

Inserttheunfixedwalljamb.

将未固定在墙上的墙材插入框架。

0mm

Note: Check whether the top and bottom rail pins are properly fixed.

Plastic inserts of bottom rail are as shown. Plastic inserts of top rail

are flat without notch.

注意:检查上下轨道的轴座有无安装好,下轨道塑料镶件如图。

上轨道塑料镶件是平的,没有缺口的。

The wall jamb must

be kept vertical.

上墙材必须垂直。

STEP

3

STEP

4

Adjust the top and bottom frames vertical. The length shall be the same on

two sides. Then rotate the lock to fix wall jamb.

将框架上下轨道调水平,垂直,两边铝材长度大致相等,

然后旋转联墙组件锁扣,固定墙材和竖材。

IMPORTANT:

Tray MUST be level

along front edge.

重要:

底盘必须水平。

Insert fixed glass into top and bottom rails and then into wall jambs.

将固定玻璃卡入上下轨道,再插入竖材内。

0mm

IMPORTANT:

Tray MUST be level

along front edge.

重要:

底盘必须水平。

0mm

Rotateclockwise

tolock.

顺时针转动,

锁紧竖材与墙材。

X

Use U-shaped protective

seals on top and bottom of

the fixed glass.

固定玻璃上下两端必须加

U型保护胶条。

X

STEP

5

STEP

6

1288024-T01-A

-3-

Insert side seal into the inside of the fix glass. Install top and bottom

blocks to make the fixed glass firm.

固玻内层插入单边胶条,按照示意图安装上下固定块,固定固玻。

Install door glass.

安装门玻。

1. Fix bottom clamp.

Caps are not installed in this step.

安装下转轴夹。注意此步不安装

装饰盖。

Pay attention to the height of top

and bottom clamps. Top clamp

shall be higher than bottom clamp.

安装时注意上下转轴夹的高度,

注意上转轴夹比下转轴夹高。

Insert side seal into the

inside of the fix glass.

固玻内侧插入单边胶条。

2. Install bottom pin washer.

Fix the door glass with bottom

clamp onto the pin washer.

安装下轴套,将带下转轴夹的

门玻装入下轴套。

BottomPin

Washer

下轴套

STEP

7

3. Fix top pin washer and clamp.

安装上轴套,固定上转轴夹。

Install seals, handle and top cover.

安装拉手以及胶条、顶盖等。

TopPin

Washer

上轴套

4. Adjust door glass to a proper

position with screws in the top and

bottom clamps (see the circled

pictures) and then install the caps.

上下转轴夹中都有调节螺丝,可以

调节门玻的下坠,扭曲(见图中圆

形位置)。将门玻调到理想位置后

盖上装饰盖。

AdjustScrew

调节螺丝

STEP

9

STEP

8

Install glass shelf and make sure it is level.

安装玻璃层板,要求玻璃层板水平放置。

Apply silicone sealant to both sides of the bottom threshold.

挡水配件内外两侧涂一层防水胶。

6.0mm

STEP

10

STEP

11

1288024-T01-A

-4-


更多推荐

安装,诗乐,产品,胶条,转轴