第一部分:设计总说明………………………………………………………………………………2
1.1工程概况…………………………………………………………………………………………2
1.2设计资料…………………………………………………………………………………………2
1.3设计内容…………………………………………………………………………………………3
1.4建筑设计…………………………………………………………………………………………3
1.5结构设计…………………………………………………………………………………………3
1.6设计要求…………………………………………………………………………………………3
1.7顶层结构布置图…………………………………………………………………………………4
1.8准标层结构布置图………………………………………………………………………………5
1.9基础结构布置图…………………………………………………………………………………6
第二部分:结构计算过程……………………………………………………………………………7
2.1构件尺寸的确定………………………………………………………………………………7
2.2荷载的计算……………………………………………………………………………………10
2.3楼地面板的计算………………………………………………………………………………11
2.4屋面板的计算…………………………………………………………………………………17
2.5屋面次梁的计算………………………………………………………………………………22
2.6楼地面次梁的计算……………………………………………………………………………24
2.7楼梯的计算……………………………………………………………………………………30
2.8横向水平风荷载………………………………………………………………………………37
2.9竖向恒荷载作用下框架的内力计算…………………………………………………………50
2.10竖向活荷载作用下框架的内力计算………………………………………………………61
2.11纵向框架的内力计算………………………………………………………………………70
2.12框架内力组合………………………………………………………………………………76
2.13基础设计……………………………………………………………………………………94
1.设计总说明
1.1工程概况
该工程为住宅大楼。要求设计建筑面积约23000m,共6层,层高为m3.3,室内外高差为m45.0。钢筋混凝
土框架结构,柱下单独基础。拟建建筑位置见图:
1.2设计资料
1.梅州气象资料:基本风压为0.35kN/㎡
2.抗震设防烈度为6度,建筑物安全等级二级
3.耐火等级Ⅱ级
4.工程地质资料:建筑场地地层由泥质页岩组成,轻微风化,无地下水,地基承载力标准值f
K
=180Kpa
5.楼地面均用现浇水磨石(地)面,上人屋面,二毡三油防水层,100mm加气混凝土隔热层。墙体均为非
承重墙,外墙、梯间墙均为180mm厚,其余各墙均为120mm厚。外墙墙面均用釉面砖装修,梯间墙墙面用混
合砂浆抹灰、压光、涂白乳胶两道,其余内墙墙面均用混合砂浆找平抹面。
6.材料选用:混凝土采用C20级,钢筋Ⅰ、Ⅱ级
1.3设计内容
1、建筑平面设计2、建筑立面设计
3、建筑剖面图设计4、结构布置及板、梁计算
5、竖向荷载作用下框架内力分析6、风荷载作用下框架内力分析
7、框架梁、柱内力组合及配筋8、基础计算
9、结构施工图绘制
1.4建筑设计
采用对称结构,结合了现代建筑宽敞明亮的特点,简单的构造中显示出了建筑的朴实无华、简洁鲜明的
风格。
1.5结构设计
本工程为六层办公楼,首层层高为3.3m,标准层为3.3m,顶层为3.3m。采用现浇混泥土框架结构。所有
荷载均按《建筑结构荷载规范》(GB50009-2001)取值。
1.6设计要求
按弹性理论进行梁、板、楼梯、框架、基础的内力分析及配筋计算,并绘制了一部分的结构施工图。
1.7顶层结构布置图
1.8准标层结构布置图
1.9基础结构布置图
2.结构计算过程:(取第三榀框架)
已知:C20的混凝土的强度为MPaf
c
6.9MPaf
t
1.1
Ⅰ、Ⅱ级的钢筋分别为:
MPaf
y
210MPaf
y
300
2.1构件尺寸的确定
2.1.1柱的截面尺寸:
kNN171862)9.38.4(29.32.41325.1
331968546.91017181.11.1mmfNA
c
采用方形截面,则2444mmAhb
cc
所以一至六层均取mmmm450450
2.1.2板的厚度计算:
单向板mmLh3935/135035/取mm100
双向板mmmmLLh5.9711140/35/取mm100
2.1.3框架梁:
A:横梁(KL01):mmmmLh600343)8/114/1(取mmh500
mmmmhb250167)2/13/1(取mmb250
横梁(KL02):mmmmLh600343)8/114/1(取mmh500
mmmmhb250167)2/13/1(取mmb250
横梁(KL03):mmmmLh600343)8/114/1(取mmh500
mmmmhb250167)2/13/1(取mmb250
横梁(KL04):mmmmLh600343)8/114/1(取mmh500
mmmmhb250167)2/13/1(取mmb250
横梁(KL05):mmmmLh600343)8/114/1(取mmh500
mmmmhb250167)2/13/1(取mmb250
横梁(KL06):mmmmLh488279)8/114/1(取mmh500
mmmmhb250167)2/13/1(取mmb250
横梁(KL07):mmmmLh488279)8/114/1(取mmh500
mmmmhb250167)2/13/1(取mmb250
横梁(KL08):mmmmLh488279)8/114/1(取mmh500
mmmmhb250167)2/13/1(取mmb250
横梁(KL09):mmmmLh488279)8/114/1(取mmh500
mmmmhb250167)2/13/1(取mmb250
横梁(KL10):mmmmLh488279)8/114/1(取mmh500
mmmmhb250167)2/13/1(取mmb250
横梁(KL11):mmmmLh263150)8/114/1(取mmh300
mmmmhb150100)2/13/1(取mmb150
B:纵梁(KL12):mmmmLh525300)8/114/1(取mmh500
mmmmhb250167)2/13/1(取mmb250
纵梁(KL13):mmmmLh525300)8/114/1(取mmh500
mmmmhb250167)2/13/1(取mmb250
纵梁(KL14):mmmmLh525300)8/114/1(取mmh500
mmmmhb250167)2/13/1(取mmb250
纵梁(KL15):mmmmLh525300)8/114/1(取mmh500
mmmmhb250167)2/13/1(取mmb250
纵梁(KL16):mmmmLh525300)8/114/1(取mmh500
mmmmhb250167)2/13/1(取mmb250
纵梁(KL17):mmmmLh488279)8/114/1(取mmh500
mmmmhb250167)2/13/1(取mmb250
纵梁(KL18):mmmmLh488279)8/114/1(取mmh500
mmmmhb250167)2/13/1(取mmb250
纵梁(KL19):mmmmLh488279)8/114/1(取mmh500
mmmmhb250167)2/13/1(取mmb250
纵梁(KL20):mmmmLh338193)8/114/1(取mmh500
mmmmhb250167)2/13/1(取mmb250
纵梁(KL21):mmmmLh338193)8/114/1(取mmh500
mmmmhb250167)2/13/1(取mmb250
纵梁(KL22):mmmmLh338193)8/114/1(取mmh500
mmmmhb250167)2/13/1(取mmb250
C:伸臂梁:(PL01):mmmmLh300250)5/16/1(取mmh500
mmmmhb250167)2/13/1(取mmb250
D:次梁:
横次梁(L01):mmmmLh225150)12/118/1(取mmh300
mmmmhb150100)2/13/1(取mmb150
横次梁(L02):mmmmLh10067)12/118/1(取mmh300
mmmmhb150100)2/13/1(取mmb150
横次梁(L03):mmmmLh200134)12/118/1(取mmh300
mmmmhb150100)2/13/1(取mmb150
横次梁(L04):mmmmLh400267)12/118/1(取mmh400
mmmmhb200134)2/13/1(取mmb200
纵次梁(L05):mmmmLh350234)12/118/1(取mmh400
mmmmhb200134)2/13/1(取mmb150
纵次梁(L06):mmmmLh175117)12/118/1(取mmh300
mmmmhb150100)2/13/1(取mmb150
纵次梁(L07):mmmmLh350234)12/118/1(取mmh400
mmmmhb200134)2/13/1(取mmb150
纵次梁(L08):mmmmLh325217)12/118/1(取mmh300
mmmmhb150100)2/13/1(取mmb150
纵次梁(L09):mmmmLh225150)12/118/1(取mmh300
mmmmhb150100)2/13/1(取mmb150
纵次梁(L10):mmmmLh225150)12/118/1(取mmh300
mmmmhb150100)2/13/1(取mmb150
2.2荷载的计算
2.2.1上人屋面:100MM厚的加气混凝土隔热层:2/55.05.51.0mkN
20MM厚的水泥砂浆找平层:2/4.02002.0mkN
二毡三油防水层:2/35.0mkN
20MM厚的水泥砂浆找平层:2/4.02002.0mkN
100MM厚钢筋混凝土现浇层:2/5.2251.0mkN
20MM厚的抹灰层:2/4.02002.0mkN
故:2/6.44.05.24.035.04.055.0mkNg
2/0.2mkNq
2.2.2楼地面:现浇水磨三石楼面:2/65.0mkN
100MM厚钢筋混凝土现浇层:2/5.25.21.0mkN
板下水泥砂浆抹灰20MM厚:2/4.02002.0mkN
故:2/55.34.05.265.0mkNg
2/0.2mkNq2/5.2mkNq(阳台)
2.3楼地面板的计算
板厚全部为100MM,
2/06.70.24.155.32.1mkNqg
2/76.75.24.155.32.1mkNqg
2.3.1
1
B的尺寸为mmmm42004800因14.14200/4800<2
故这双向板便有
yx
ll/88.04800/4200
所以mkNM
X
32.102.406.70829.020
2672mmA
S
选用120@10
mkNM
y
13.92.406.70733.020
2592mmA
S
选用125@10
mkNM
x
56.42.406.70366.02
max,
2288mmA
S
选用180@8
mkNM
y
54.32.406.70284.02
max,
2224mmA
S
选用225@8
2.3.2
2
B的尺寸为mmmm39004200因08.13900/4200<2
故这双向板便有
yx
ll/93.04200/3900
所以
mkNM
X
33.89.306.70776.020
2528mmA
S
选用150@10
mkNM
y
69.79.306.70716.020
2480mmA
S
选用160@10
mkNM
x
62.39.306.70337.02
max,
2224mmA
S
选用225@8
mkNM
y
09.39.306.70288.02
max,
2192mmA
S
选用250@8
2.3.3
3
B的尺寸为mmmm24004200因75.12400/4200<2
故这双向板便有
yx
ll/57.04200/2400
所以mkNM
X
45.44.206.71093.020
2272mmA
S
选用180@8
mkNM
y
17.34.206.70780.020
2192mmA
S
选用150@6
mkNM
x
29.24.206.70563.02
max,
2144mmA
S
选用200@6
mkNM
y
91.04.206.70223.02
max,
280mmA
S
选用250@6
2.3.4
4
B的尺寸为mmmm12002100因75.11200/2100<2
故这双向板便有
yx
ll/57.02100/1200
所以
mkNM
X
83.02.106.70814.020
280mmA
S
选用250@6
mkNM
y
581.02.106.70571.020
280mmA
S
选用250@6
mkNM
x
40.02.106.70394.02
280mmA
S
选用250@6
mkNM
y
12.02.106.70120.02
280mmA
S
选用250@6
2.3.5
5
B的尺寸为mmmm21002400因14.12100/2400<2
故这双向板便有
yx
ll/88.02400/2100
所以mkNM
X
16.21.206.70693.020
2126mmA
S
选用225@6
mkNM
y
13.21.206.70683.020
2126mmA
S
选用225@6
mkNM
x
97.01.206.70312.02
max,
290mmA
S
选用250@6
mkNM
y
86.01.206.70277.02
max,
290mmA
S
选用250@6
2.3.6
6
B的尺寸为mmmm9001200因34.1900/1200<2
故这双向板便有
yx
ll/75.01200/900
所以
mkNM
X
47.09.006.70830.020
290mmA
S
选用250@6
mkNM
y
42.09.006.70729.020
290mmA
S
选用250@6
mkNM
x
22.09.006.70390.02
max,
290mmA
S
选用250@6
mkNM
y
16.09.006.70273.02
max,
290mmA
S
选用250@6
2.3.7
7
B的尺寸为mmmm12003300因75.21200/3300>2
故这单向板
mkNqlM27.12.106.78/18/122
280mmA
S
选用250@6
2.3.8
8
B的尺寸为mmmm21002700因29.12100/2700<2
故这双向板便有
yx
ll/78.02700/2100
所以mkNM
X
34.21.206.70750.020
2126mmA
S
选用225@6
mkNM
y
78.11.206.70572.020
2108mmA
S
选用250@6
mkNM
x
12.11.206.70358.02
max,
290mmA
S
选用250@6
mkNM
y
60.01.206.70193.02
max,
290mmA
S
选用250@6
2.3.9
9
B的尺寸为mmmm21002700因29.12100/2700<2
故这双向板便有
yx
ll/78.02700/2100
所以
mkNM
X
49.21.206.70799.020
2144mmA
S
选用200@6
mkNM
x
19.11.206.70381.02
290mmA
S
选用250@6
mkNM
y
46.01.206.70149.02
290mmA
S
选用250@6
2.3.10
10
B的尺寸为mmmm39004800因23.13900/4800<2
故这双向板便有
yx
ll/81.04800/3900
所以
mkNM
X
48.99.306.70883.020
2608mmA
S
选用125@10
mkNM
y
03.89.306.70748.020
2512mmA
S
选用150@10
mkNM
x
26.49.306.70397.02
max,
2272mmA
S
选用180@8
mkNM
y
99.29.306.70278.02
max,
2192mmA
S
选用150@6
2.3.11
11
B的尺寸为mmmm39003900因13900/3900<2
故这双向板便有
yx
ll/13900/3900
所以
mkNM
X
27.79.306.70677.020
2464mmA
S
选用160@10
mkNM
y
27.79.306.70677.020
2464mmA
S
选用160@10
mkNM
x
02.39.306.70281.02
max,
2192mmA
S
选用150@6
mkNM
y
10.39.306.70289.02
max,
2192mmA
S
选用150@6
2.3.12
12
B的尺寸为mmmm15003900因6.21500/3900>2
故这单向板
mkNqlM99.15.106.78/18/122
2128mmA
S
选用220@6
2.3.13
13
B的尺寸为mmmm13504800因56.31350/4800>2
故这单向板
mkNqlM61.135.106.78/18/122
2112mmA
S
选用250@6
2.3.14
14
B的尺寸为mmmm42004800因14.14200/4800<2
故这双向板便有
yx
ll/88.04800/4200
所以mkNM
X
63.82.406.70693.020
2560mmA
S
选用140@10
mkNM
y
06.72.406.70567.020
2448mmA
S
选用180@10
mkNM
x
97.32.406.70319.02
max,
2240mmA
S
选用200@8
mkNM
y
54.22.406.70204.02
max,
2160mmA
S
选用180@6
2.3.15
15
B的尺寸为mmmm39004200因08.13900/4200<2
故这双向板便有
yx
ll/93.04200/3900
所以
mkNM
X
01.79.306.70653.020
2448mmA
S
选用180@10
mkNM
y
04.79.306.70656.020
2342mmA
S
选用140@8
mkNM
x
97.29.306.70277.02
max,
2192mmA
S
选用150@6
mkNM
y
93.29.306.70273.02
max,
2192mmA
S
选用150@6
2.4屋面板的计算
单向板全为100MM,双向板全为100MM
2/32.80.24.160.42.1mkNqg
2.4.1
1
WB的尺寸为mmmm42004800因14.14200/4800<2
故这双向板便有88.04800/4200
所以mkNM
X
17.122.432.80829.020
2858mmA
S
选用90@10
mKNM
y
/76.102.432.80733.020
2704mmA
S
选用160@12
mkNM
x
37.59.332.80366.02
max,
2336mmA
S
选用150@8
mkNM
y
17.42.432.80284.02
max,
2256mmA
S
选用200@8
2.4.2
2
WB的尺寸为mmmm39004200因08.13900/4200<2
故这双向板便有93.04200/3900
所以
mkNM
X
82.99.332.80776.020
2640mmA
S
选用120@10
mkNM
y
06.99.332.80716.020
2576mmA
S
选用140@10
mkNM
x
26.49.332.80337.02
max,
2272mmA
S
选用180@8
mkNM
y
64.39.332.80288.02
max,
2224mmA
S
选用225@8
2.4.3
3
WB的尺寸为mmmm42004800因14.14200/4800<2
故这双向板便有88.04800/4200
所以
mkNM
X
17.102.432.80693.020
2656mmA
S
选用120@10
mkNM
y
32.82.432.80567.020
2528mmA
S
选用150@10
mkNM
x
68.42.432.80319.02
max,
2288mmA
S
选用180@8
mkNM
y
99.22.432.80204.02
max,
2192mmA
S
选用150@6
2.4.4
4
WB的尺寸为mmmm39004200因08.13900/4200<2
故这双向板便有93.04200/3900
所以
mkNM
X
26.89.332.80653.020
2528mmA
S
选用150@10
mkNM
y
30.89.332.80656.020
2528mmA
S
选用150@10
mkNM
x
51.39.332.80277.02
max,
2224mmA
S
选用225@8
mkNM
y
45.39.332.80273.02
max,
2224mmA
S
选用225@8
2.4.5
5
WB的尺寸为mmmm39004800因23.13900/4800<2
故这双向板便有81.04800/3900
所以
mkNM
X
14.99.332.80722.020
2592mmA
S
选用85@8
mkNM
y
21.79.332.80570.020
2464mmA
S
选用100@8
mkNM
x
29.49.332.80339.02
max,
2272mmA
S
选用180@8
mkNM
y
52.29.332.80199.02
max,
2160mmA
S
选用180@6
2.4.6
6
WB的尺寸为mmmm39003900因13900/3900<2
故这双向板便有13900/3900
所以
mkNM
X
57.89.332.80677.020
2544mmA
S
选用140@10
mkNM
y
57.89.332.80677.020
2544mmA
S
选用140@10
mkNM
x
56.39.332.80281.02
max,
2224mmA
S
选用225@8
mkNM
y
66.39.332.80289.02
max,
2224mmA
S
选用225@8
2.4.7
7
WB的尺寸为mmmm27004800因78.12700/4800<2
故这双向板便有56.04800/2700
所以
mkNM
X
09.57.232.80840.020
2320mmA
S
选用160@8
mkNM
x
52.27.232.80415.02
2160mmA
S
选用180@6
mkNM
y
58.07.232.80096.02
280mmA
S
选用250@6
2.4.8
8
WB的尺寸为mmmm42004800因14.14200/4800<2
故这双向板便有88.04800/4200
所以mkNM
X
17.102.432.80693.020
2656mmA
S
选用120@10
mkNM
y
32.82.432.80567.020
2528mmA
S
选用150@10
mkNM
x
68.42.432.80319.02
max,
2288mmA
S
选用180@8
mkNM
y
99.22.432.80204.02
max,
2192mmA
S
选用150@6
2.4.9
9
WB的尺寸为mmmm39004200因08.13900/4200<2
故这双向板便有93.04200/3900
所以
mkNM
X
26.89.332.80653.020
2528mmA
S
选用150@10
mkNM
y
30.89.332.80656.020
2528mmA
S
选用150@10
mkNM
x
51.39.332.80277.02
max,
2224mmA
S
选用225@8
mkNM
y
45.39.332.80279.02
max,
2224mmA
S
选用225@8
2.4.10
10
WB的尺寸为mmmm10001000因11000/1000<2
故这双向板便有11000/1000
所以
mkNM
X
36.00.132.8429.02
280mmA
S
选用250@6
mkNM
y
36.00.132.8429.02
280mmA
S
选用250@6
2.4.11
11
WB的尺寸为mmmm10004200因2.41000/4200>2
故这单向板
mkNqlM04.10.132.88/18/122
280mmA
S
选用250@6
2.4.12
12
WB的尺寸为mmmm10003900因9.31000/3900>2
故这单向板
mkNqlM04.10.132.88/18/122
280mmA
S
选用250@6
2.4.11
11
WB的尺寸为mmmm10004800因8.41000/4800>2
故这单向板
mkNqlM04.10.132.88/18/122
280mmA
S
选用250@6
2.4.11
11
WB的尺寸为mmmm10002700因7.21000/2700>2
故这单向板
mkNqlM04.10.132.88/18/122
280mmA
S
选用250@6
2.5屋面次梁的计算
2.5.1A、WL01的截面尺寸为mmmm300150
B、荷载的计算:a、上部女儿墙传来的荷载:mkN/31.41918.005.12.1
b、板WB11传来的荷载:mkN/16.45.024.15.06.42.1
c、梁自重:mkN/99.0162)1.03.0(012.02.125)1.03.0(15.02.1
合计:mkNqg/46.999.016.431.4
C、内力计算:a、跨中弯矩为:mkNqlM86.202.446.98/18/122
故选用122ρ=%2.0%502.0300150/226(符合要求)
b、梁端剪力为:kNqlV87.192.446.92/12/1
mmh27525300
0
故
VkNbhf
c
76.372751501.17.07.0
0
所以该梁只需要按构造配筋,选用200@6的双肢箍筋,其配箍率为
ρ
%126.0210/1.124.0/24.0%189.0200150/6.56
sv
yvt
ff
(符合要求)
D、画配筋图,其配筋图详见结施01号图纸
2.5.2A、WL02的截面尺寸为mmmm300150
B、荷载的计算:a、上部女儿墙传来的荷载:mkN/31.41918.005.12.1
b、板WB11传来的荷载:mkN/16.45.024.15.06.42.1
c、梁自重:mkN/99.0162)1.03.0(012.02.125)1.03.0(15.02.1
合计:mkNqg/46.999.016.431.4
C、内力计算:a、跨中弯矩为:
mkNqlM99.179.346.98/18/122
故选用122ρ=%2.0%502.0300150/226(符合要求)
b、梁端剪力为:kNqlV45.189.346.92/12/1
mmh27525300
0
故
VkNbhf
c
76.372751501.17.07.0
0
所以该梁只需要按构造配筋,选用200@6的双肢箍筋,其配箍率为
ρ
%126.0210/1.124.0/24.0%189.0200150/6.56
sv
yvt
ff
(符合要求)
D、画配筋图,其配筋图详见结施01号图纸
2.5.3A、WL03的截面尺寸为mmmm300150
B、荷载的计算:a、上部女儿墙传来的荷载:mkN/31.41918.005.12.1
b、板WB11传来的荷载:mkN/16.45.024.15.06.42.1
c、梁自重:mkN/99.0162)1.03.0(012.02.125)1.03.0(15.02.1
合计:mkNqg/46.999.016.431.4
C、内力计算:a、跨中弯矩为:mkNqlM62.87.246.98/18/122
故选用122ρ=%2.0%502.0300150/226(符合要求)
b、梁端剪力为:kNqlV77.127.246.92/12/1
mmh27525300
0
故
VkNbhf
c
76.372751501.17.07.0
0
所以该梁只需要按构造配筋,选用200@6的双肢箍筋,其配箍率为
ρ
%126.0210/1.124.0/24.0%189.0200150/6.56
sv
yvt
ff
(符合要求)
D、画配筋图,其配筋图详见结施01号图纸
2.5.4A、WL04的截面尺寸为mmmm300150
B、荷载的计算:a、上部女儿墙传来的荷载:mkN/31.41918.005.12.1
b、板WB11传来的荷载:mkN/16.45.024.15.06.42.1
c、梁自重:mkN/99.0162)1.03.0(012.02.125)1.03.0(15.02.1
合计:mkNqg/46.999.016.431.4
C、内力计算:a、跨中弯矩为:
mkNqlM24.278.446.98/18/122
故选用162ρ=%2.0%893.0300150/402(符合要求)
b、梁端剪力为:kNqlV7.228.446.92/12/1
mmh27525300
0
故
VkNbhf
c
76.372751501.17.07.0
0
所以该梁只需要按构造配筋,选用200@6的双肢箍筋,其配箍率为
ρ
%126.0210/1.124.0/24.0%189.0200150/6.56
sv
yvt
ff
(符合要求)
D、画配筋图,其配筋图详见结施01号图纸
2.6楼地面次梁的计算
2.6.1A、L01的截面尺寸为mmmm300150
B、荷载的计算:a、上部墙体传来的荷载:
mkN/94.9202)3.03.3(012.02.119)3.03.0(12.02.1
b、板B08传来的荷载:mkN/82.5785.005.1)24.155.32.1(
c、板B09传来的荷载:mkN/82.5785.005.1)24.155.32.1(
d、梁自重:mkN/992.0162)1.03.0(012.02.125)1.03.0(15.02.1
合计:mkNqg/57.22992.082.582.594.9
C、内力计算:a、跨中弯矩为:
mkNqlM57.207.257.228/18/122
故选用142ρ=%2.0%684.0300150/308(符合要求)
b、梁端剪力为:kNqlV77.277.257.202/12/1
mmh27525300
0
故
VkNbhf
c
76.372751501.17.07.0
0
所以该梁只需要按构造配筋,选用200@6的双肢箍筋,其配箍率为
ρ
%126.0210/1.124.0/24.0%189.0200150/6.56
sv
yvt
ff
(符合要求)
D、画配筋图,其配筋图详见结施02号图纸
2.6.2A、L02的截面尺寸为mmmm300150
B、荷载的计算:a、上部墙体传来的荷载:
mkN/94.9202)3.03.3(012.02.119)3.03.0(12.02.1
b、板B06传来的荷载:mkN/45.2771.045.0)24.155.32.1(
c、梁自重:mkN/992.0162)1.03.0(012.02.125)1.03.0(15.02.1
合计:mkNqg/38.13992.045.294.9
C、内力计算:a、跨中弯矩为:
mkNqlM41.22.138.138/18/122
故选用122ρ=%2.0%502.0300150/226(符合要求)
b、梁端剪力为:kNqlV03.82.138.132/12/1
mmh27525300
0
故VkNbhf
c
76.372751501.17.07.0
0
所以该梁只需要按构造配筋,选用200@6的双肢箍筋,其配箍率为
ρ
%126.0210/1.124.0/24.0%189.0200150/6.56
sv
yvt
ff(符合要求)
D、画配筋图,其配筋图详见结施02号图纸
2.6.3A、L06的截面尺寸为mmmm300150
B、荷载的计算:a、上部墙体传来的荷载:
mkN/94.9202)3.03.3(012.02.119)3.03.0(12.02.1
b、板B04传来的荷载:mkN/63.3858.06.0)24.155.32.1(
c、板B04传来的荷载:mkN/63.3858.06.0)24.155.32.1(
d、梁自重:mkN/992.0162)1.03.0(012.02.125)1.03.0(15.02.1
合计:mkNqg/19.18992.063.363.394.9
C、内力计算:a、跨中弯矩为:
mkNqlM03.101.219.188/18/122
故选用122ρ=%2.0%502.0300150/226(符合要求)
b、梁端剪力为:kNqlV1.191.219.182/12/1
mmh27525300
0
故
VkNbhf
c
76.372751501.17.07.0
0
所以该梁只需要按构造配筋,选用200@6的双肢箍筋,其配箍率为
ρ
%126.0210/1.124.0/24.0%189.0200150/6.56
sv
yvt
ff
(符合要求)
D、画配筋图,其配筋图详见结施02号图纸
2.6.4A、L04的截面尺寸为mmmm400200
B、荷载的计算:a、上部墙体传来的荷载:
mkN/58.13202)4.03.3(012.02.119)4.03.0(18.02.1
b、板B13传来的荷载:mkN/77.46875.0)24.155.32.1(
c、板B13传来的荷载:mkN/77.46875.0)24.155.32.1(
d、梁自重:mkN/94.1162)1.04.0(012.02.125)1.04.0(2.02.1
合计:mkNqg/06.2594.177.477.458.13
C、内力计算:a、跨中弯矩为:mkNqlM17.728.406.258/18/122
故选用164ρ=%2.0%005.1400200/804(符合要求)
b、梁端剪力为:kNqlV14.608.406.252/12/1
mmh37525300
0
故
VkNbhf
c
75.573752001.17.07.0
0
所以必须查表配置选用200@6的双肢箍筋,其配箍率为
ρ
%126.0210/1.124.0/24.0%142.0200200/6.56
sv
yvt
ff
(符合要求)
D、画配筋图,其配筋图详见结施02号图纸
2.6.5A、L08的截面尺寸为mmmm300150
B、荷载的计算:a、上部墙体传来的荷载:
mkN/91.420205.1012.02.11905.118.02.1
b、板B06传来的荷载:mkN/82.575.0)24.155.32.1(
c、梁自重:mkN/992.0162)1.03.0(012.02.125)1.03.0(15.02.1
合计:mkNqg/72.11992.082.591.4
C、内力计算:a、跨中弯矩为:
mkNqlM28.229.372.118/18/122
故选用162ρ=%2.0%89.0300150/402(符合要求)
b、梁端剪力为:kNqlV85.229.372.112/12/1
mmh27525300
0
故
VkNbhf
c
76.372751501.17.07.0
0
所以该梁只需要按构造配筋,选用200@6的双肢箍筋,其配箍率为
ρ
%126.0210/1.124.0/24.0%189.0200150/6.56
sv
yvt
ff
(符合要求)
D、画配筋图,其配筋图详见结施02号图纸
2.6.6A、L05的截面尺寸为mmmm400200
B、荷载的计算:a、上部墙体传来的荷载:
mkN/6.9202)4.03.3(012.02.119)4.03.0(12.02.1
b、板B06传来的荷载:mkN/45.2771.045.0)24.155.32.1(
c、板B07传来的荷载:mkN/24.46.0)24.155.32.1(
d、板B08传来的荷载:mkN/82.5785.005.1)24.155.32.1(
e、板B09传来的荷载:mkN/82.5785.005.1)24.155.32.1(
f、梁L01传来的集中荷载:kNV77.27
g、梁L02传来的集中荷载:kNV03.8
h、梁自重:mkN/94.1162)1.04.0(012.02.125)1.04.0(2.02.1
C、内力计算:
a、所以其受力图如下表示:
b、求支痤反力:kNF
B
79.602.4/)55.23.36.211.277.279.003.845.09.081.19(
kNF
A
12.6479.603.36.2177.2703.89.081.19
c、求1、2点的弯矩:mkNM68.4945.09.081.199.012.64
1
mkNM28.7905.11.294.211.219.60
2
故选用203ρ=%2.0%18.1400200/941(符合要求)
d、梁端剪力为:KNV51.60和kNV12.64故取大者:所以kNV12.64
mmh37525400
0
故VkNbhf
c
75.573752001.17.07.0
0
所以必须按查表配筋,选用200@6的双肢箍筋,其配箍率为
ρ
%126.0210/1.124.0/24.0%142.0200200/6.56
sv
yvt
ff(符合要求)
D、画配筋图,其配筋图详见结施02号图纸
2.6.7A、L03的截面尺寸为mmmm300150
B、荷载的计算:a、上部墙体传来的荷载:
mkN/94.9202)3.03.3(012.02.119)3.03.0(12.02.1
b、板B04传来的荷载:mkN/64.3859.06.0)24.155.32.1(
c、板B04传来的荷载:mkN/64.3859.06.0)24.155.32.1(
d、板B05传来的荷载:mkN/2.5701.005.1)24.155.32.1(
e、梁L06传来的集中荷载:mkNV/1.19
f、梁自重:mkN/992.0162)1.03.0(012.02.125)1.03.0(15.02.1
C、内力计算:
a、所以其受力图如下表示:
b、求支痤反力:kNF
B
28.334.2/)2.11.192.14.2772.19(
kNF
A
28.3328.331.194.2772.19
c、求1点的弯矩:mkNM7.256.02.1772.192.128.33
1
故选用162ρ=%2.0%893.0300150/402(符合要求)
d、梁端剪力为:kNV28.33
mmh27525300
0
故VkNbhf
c
76.372751501.17.07.0
0
所以该梁只需要按构造配筋,选用200@6的双肢箍筋,其配箍率为
ρ
%126.0210/1.124.0/24.0%189.0200150/6.56
sv
yvt
ff(符合要求)
D、画配筋图,其配筋图详见结施02号图纸
2.6.8A、L07的截面尺寸为mmmm400200
B、荷载的计算:a、上部墙体传来的荷载:
mkN/6.9202)4.03.3(012.02.119)4.03.0(12.02.1
b、板B03传来的荷载:mkN/28.7859.02.1)24.155.32.1(
c、板B04传来的荷载:mkN/64.3859.06.0)24.155.32.1(
d、板B05传来的荷载:mkN/2.5701.005.1)24.155.32.1(
e、梁L06传来的集中荷载:kNV28.33
f、梁自重:mkN/94.1162)1.04.0(012.02.125)1.04.0(2.02.1
C、内力计算:
a、所以其受力图如下表示:
b、求支痤反力:kNF
B
26.662.4/)15.31.202.241.228.3305.11.246.22(
kNF
A
63.6426.661.202.2428.331.246.22
c、求1点的弯矩:mkNM2.8605.11.246.221.263.64
1
故选用203ρ=%2.0%18.1400200/941(符合要求)
d、梁端剪力为:KNV26.66和kNV63.64故取大者:kNV26.66
mmh37525400
0
故VkNbhf
c
75.573752001.17.07.0
0
所以该梁按查表计算配筋,选用200@6的双肢箍筋,其配箍率为
ρ
%126.0210/1.124.0/24.0%142.0200200/6.56
sv
yvt
ff
(符合要求)
D、画配筋图,其配筋图详见结施02号图纸
2.7楼梯的计算
2.7.1第一层
A、第一跑梯段板(TB01)的计算
a、确定板厚:
mmlh9930/270)112(30/
0
取mmh100
b、荷载的计算:
楼梯斜板的倾斜角:'0233161.0arctan270/165arctana864.0cosa
恒荷载踏步重mkN/06.225165.027.05.027.0/0.1
斜板重mkN/89.2251.0864.0/0.1
mkNmm/65.02002.00.127.0/)165.027.0(:20厚找平层
故:mkNg/6.565.089.206.2
活荷载mkNq/0.210.2
总荷载mkNqg/52.90.24.16.52.1
c、跨中弯矩:
mkNglM/4.897.252.910/110/122
故选用140@10的钢筋,2561mmA
s
,分布筋选用300@6的钢筋
B、平台板(B17)的计算:
a、平台板厚:取板厚mmh100
b、荷载的计算:
恒荷载板自重mkN/5.22511.0
mkNmm/4.02002.00.1:20厚找平层
故:mkNg/9.24.05.2
活荷载mkNq/0.210.2
总荷载mkNqg/28.60.24.19.22.1
c、内力计算跨度:
mhll
n
38.105.033.12/1.033.12/
0
跨中弯矩:
mkNqlM49.138.128.610/110/122
故选用250@6的钢筋,2113mmA
s
C、第二跑梯段板(TB02)的计算
a、确定板厚:
mmlh10030/300030/
0
取mmh100
b、荷载的计算:
楼梯斜板的倾斜角:'0233161.0arctan270/165arctana864.0cosa
踏步段:
恒荷载踏步重mkN/06.225165.027.05.027.0/0.1
斜板重mkN/89.2251.0864.0/0.1
mkNmm/65.02002.00.127.0/)165.027.0(:20厚找平层
故:mkNg/6.565.089.206.2
活荷载mkNq/0.210.2
总荷载mkNqg/52.90.24.16.52.1
平台段:梯板自重mkN/5.22511.0
mkNmm/65.02002.00.127.0/)165.027.0(:20厚找平层
故:mkNg/9.24.05.2
活荷载mkNq/0.210.2
总荷载mkNqg/28.60.24.19.22.1
c、内力的计算,其受力图如下图
故kNV
B
61.133/11.12/89.189.152.9555.011.128.6
kNV
A
35.1161.1389.152.911.128.6
最大弯矩截面到A截面的距离:mX43.152.9/61.13
则
mkNM73.943.15.043.152.943.161.13
max
故选用100@10,支座负筋按构造要求配置,选用140@6
D、平台梁(L10)的计算:
a、荷载的计算:同时由梯段板(TB01)和(TB02)传来,取大者
TB01mkN/18.15TB02mkN/72.18所以取TB02mkN/72.18
平台板传来:mkN/59.52/38.120.028.6
梁自重:mkN/992.0162)1.03.0(012.02.125)1.03.0(15.02.1
合计:mkNqg/3.25992.059.572.18
b、内力计算:
ml7.218.052.2
0
mll
n
65.25.205.105.1
0
两者取小者,ml65.2
0
故
mkNlqM21.2265.23.258/18/122
max
kNqlV88.3152.23.252/12/1
max
c、配筋计算:
纵向钢筋:选用162,2402mmA
s
箍筋计算:mmh24525270
0
kNkNbhf
c
88.3113.312451651.17.07.0
0
故需要按计算配置箍筋,因467.1165/275//
0
bhbh
w
则kNkNbhfB
cc
88.31992451656.90.125.025.0
0
截面尺寸足够,单位长度箍筋面积为:
233
001
0117.01013.311088.3125.1/7.0/mmhfbhfvSnA
yvtsv
取箍筋肢数2n,直径2
1
3.286mmAmmd
svsv
则箍筋间距为:mmS61.48370117.0/3.282
故按规定选用200@6的双肢箍筋
d、钢筋布置图见结施03号图纸
E、平台板B16的计算:
a、平台板厚:取板厚mmh100
b、荷载的计算:
恒荷载板自重:mkN/5.22511.0
mkNmm/4.02002.00.1:20厚找平层
故:mkNg/9.24.05.2
活荷载mkNq/0.210.2
总荷载mkNqg/28.60.24.19.22.1
c、内力计算跨度:
mhll
n
42.105.037.12/1.037.12/
0
跨中弯矩:
mkNqlM58.142.128.68/18/122
故选用250@6的钢筋,2113mmA
s
F、平台梁L09待板TB03计算后看荷载再计算
2.7.2标准层楼梯的计算:(等级跑)
A、梯段板(TB03)的计算:
a、确定板厚:
mmlh10030/300030/
0
取mmh100
b、荷载的计算:
楼梯斜板的倾斜角:'05726300/150arctana89.0cosa
恒荷载踏步重mkN/875.1253.015.05.03.0/0.1
斜板重mkN/81.2251.089.0/0.1
mkNmm/6.02002.00.13.0/)3.015.0(:20厚找平层
故:mkNg/26.56.081.2875.1
活荷载mkNq/0.210.2
总荷载mkNqg/11.90.24.126.52.1
c、内力计算:ml33.0111
0
跨中弯矩:
mkNglM2.8311.910/110/122
故选用140@10的钢筋,2561mmA
s
,分布筋选用300@6的钢筋
B、平台梁(L09)的计算:
a、荷载的计算:同时由梯段板(TB02)和(TB03)传来,取大者
TB02mkN/72.18TB03mkN/67.13所以取TB02mkN/72.18
平台板传来:mkN/15.487.02/52.128.6
梁自重:mkN/9.025)1.03.0(15.02.1
合计:mkNqg/77.239.015.472.18
b、内力计算:
mall
n
7.218.052.2
0
故
mkNlqM66.217.277.238/18/122
max
kNqlV09.327.277.232/12/1
max
c、配筋计算:
纵向钢筋:选用162,2402mmA
s
箍筋计算:
mmh27525300
0
kNkNbhf
c
09.3276.312751501.17.07.0
0
故需要按查表配置箍筋,选用200@6的双肢箍筋,其配箍率为
ρ
%126.0210/1.124.0/24.0%189.0200150/6.56
sv
yvt
ff(符合要求)
d、钢筋布置图见结施03号图纸
C、平台板(B18)的计算(同第一层B16一样)
D、平台板(B19)的计算(同第一层B17一样)
E、平台梁(L11)的计算:
a、荷载的计算:梯段板TB03传来:mkN/67.132/311.9
平台板传来:mkN/15.487.02/52.128.6
梁自重:mkN/9.025)1.03.0(15.02.1
合计:mkNqg/72.189.015.467.13
b、内力计算:
mall
n
7.218.052.2
0
故
mkNlqM06.177.272.188/18/122
max
kNqlV27.257.272.182/12/1
max
c、配筋计算:
纵向钢筋:选用142,2308mmA
s
箍筋计算:
mmh27525300
0
kNkNbhf
c
27.2576.312751501.17.07.0
0
故需要按查表配置箍筋,选用200@6的双肢箍筋,其配箍率为
ρ
%126.0210/1.124.0/24.0%189.0200150/6.56
sv
yvt
ff
(符合要求)
d、钢筋布置图见结施03号图纸
F、平台梁(L12)的计算:
a、荷载的计算:梯段板TB03传来:mkN/67.132/311.9
平台板传来:mkN/08.42/3.128.6
梁自重:mkN/9.025)1.03.0(15.02.1
合计:mkNqg/65.189.008.467.13
b、内力计算:
mall
n
7.218.052.2
0
故
mkNlqM177.265.188/18/122
max
kNqlV18.257.265.182/12/1
max
c、配筋计算:
纵向钢筋:选用142,2308mmA
s
箍筋计算:mmh27525300
0
kNkNbhf
c
27.2576.312751501.17.07.0
0
故需要按查表配置箍筋,选用200@6的双肢箍筋,其配箍率为
ρ
%126.0210/1.124.0/24.0%189.0200150/6.56
sv
yvt
ff
(符合要求)
d、钢筋布置图见结施03号图纸
2.8横向水平风荷载
(底层高度为:mh8.43.345.005.1)
2.8.12/35.0mkNW
O
mmH30247.263.345.005.1取0.1
2
风压体型系数查《荷载规范》得:
5.08.0
s
则
2/455.035.03.10.1mkNW
zzk
那么各节点处的集中风力为:
ziiiiki
hhhhWW182.02/16.3
风压高度系数
z
取值
离地高度4.88.111.414.71821.3
z
111.041.131.211.27
那么:kNW53.427.105.13.382.0
6
kNW55.621.13.33.382.0
5
kNW12.63.305.13.382.0
4
kNW63.504.13.33.382.0
3
kNW41.513.33.382.0
2
kNW64.618.43.382.0
1
2.8.2杆件线刚度计算
①梁::KL08433
0
106.25.025.012/1mI
433
0
102.5106.222mII
b
mkNiIEi
bcb
436104.39.3/102.5105.25/
:KL03433
0
106.25.025.012/1mI
433
0
102.5106.222mII
b
mkNiIEi
bcb
4361076.28.4/102.5105.25/
伸臂梁::PL01433
0
106.25.025.012/1mI
433
0
102.5106.222mII
b
mkNiIEi
bcb
4361084.85.1/102.5105.25/
②柱:1层:4331042.345.045.012/1mI
c
mkNhIEi
ccc
4361082.18.4/1042.3105.25/
2-6层:4331042.345.045.012/1mI
c
mkNhIEi
ccc
4361064.23.3/1042.3105.25/
故该框架梁横向计算简图如下:
2.8.3计算该框架在风荷载作用下的内力图:
①计算柱抗侧移刚度
ij
D及各层
ij
D
A、底层:柱1、87.182.1/4.3
_
k
613.087.12/87.15.0a
mkND/1058.08.4/1082.112613.0424
11
柱2、mkN
kib
/1038.382.1/76.24.3
_
4
721.038.32/38.35.02/5.0kka
mkNhiicaD/1068.08.4/1082.112721.0/124242
12
柱3、52.182.1/76.2
_
k
574.052.12/52.15.0a
mkND/1054.08.4/1082.112574.0424
13
B、2-6层:柱1、29.164.2/4.3
_
k
404.029.12/29.1a
mkND
i
/1018.13.3/1064.212404.0424
1
柱2、mkNis
kib
/1033.264.22/276.24.32/
_
4
54.033.22/33.22/
kk
a
mkNhiicaD
i
/1057.13.3/1064.21254.0/124242
2
柱3、05.164.2/76.2
_
k
34.005.12/05.1a
mkND
i
/1099.03.3/1064.21234.0424
3
C、由以上可求得各层
ij
D
为:
mkNDijD/108.11054.01068.01058.04444
1
mkNDijD
i
/1074.31099.01057.11018.14444
②求各柱剪力
ij
V
iij
VDijDijV/
A、6层:
kNV53.4
6
kNV43.153.474.3/18.1
1
6
kNV9.153.474.3/57.1
2
6
kNV2.153.474.3/99.0
3
6
B、5层:
kNV08.1155.653.4
5
kNV5.308.1174.3/18.1
1
5
kNV65.408.1174.3/57.1
2
5
kNV93.208.1174.3/99.0
3
5
C、4层:kNV2.1712.608.11
4
kNV43.52.1774.3/18.1
1
4
kNV99.62.1774.3/57.1
2
4
kNV55.42.1774.3/99.0
3
4
D、3层:kNV83.2263.52.17
3
kNV2.783.2274.3/18.1
1
3
kNV28.983.2274.3/57.1
2
3
kNV04.683.2274.3/99.0
3
3
E、2层:kNV24.2841.583.22
2
kNV91.824.2874.3/18.1
1
2
kNV48.1124.2874.3/57.1
2
2
kNV48.724.2874.3/99.0
3
2
F、1层:kNV88.3464.624.28
1
kNV24.1188.3474.3/18.1
1
1
kNV18.1388.3474.3/57.1
2
1
kNV46.1088.3474.3/99.0
3
1
③求各柱反弯点高度位置:
A、6层:柱1:0101365.029.166
332110
,r,a,r,r,a,r
k
,,nm不考虑
mrh2.13.3000365.0所以
柱2:0417.033.266
3210
rr,r,r
k
,,nm
mrh38.13.3417.0所以
柱2:0353.005.166
3210
rr,r,r
k
,,nm
mrh16.13.3353.0所以
B、5层:柱1:0415.029.156
3210
rr,r,r
k
,,nm
mrh37.13.3415.0所以
柱2:045.033.266
3210
rr,r,r
k
,,nm
mrh49.13.345.0所以
柱2:0401.005.166
3210
rr,r,r
k
,,nm
mrh32.13.3401.0所以
C、4层:柱1:045.029.146
3210
rr,r,r
k
,,nm
mrh49.13.345.0所以
柱2:0467.033.246
3210
rr,r,r
k
,,nm
mrh54.13.3467.0所以
柱2:045.005.146
3210
rr,r,r
k
,,nm
mrh49.13.345.0所以
D、3层:柱1:0465.029.136
3210
rr,r,r
k
,,nm
mrh53.13.3465.0所以
柱2:05.033.236
3210
rr,r,r
k
,,nm
mrh65.13.35.0所以
柱2:0453.005.136
3210
rr,r,r
k
,,nm
mrh5.13.3453.0所以
E、2层:柱1:0,45.13.3/8.4,05.029.126
33210
rar,r,r
k
,,nm
mrh65.13.35.0所以
柱2:0,45.13.3/8.4,05.033.226
33210
rar,r,r
k
,,nm
mrh65.13.35.0所以
柱2:0,45.13.3/8.4,05.005.126
33210
rar,r,r
k
,,nm
mrh65.13.35.0所以
F、1层:柱1:0,69.08.4/3.3,0563.087.116
32210
rra,r,r
k
,,nm
mrh7.28.4563.0所以
柱2:0,69.08.4/3.3,055.038.316
32210
rra,r,r
k
,,nm
mrh64.28.455.0所以
柱2:0,69.08.4/3.3,0598.052.116
32210
rra,r,r
k
,,nm
mrh87.28.4598.0所以
④荷载作用下的水平位移验算:
n
层高DijD
i
i
V
Ii
DVi/
h/H/
63.33.744.530.120.000036
53.33.7411.080.300.000099
43.33.4717.20.460.000139
33.33.7422.830.610.000184
23.33.7428.240.760.00023
14.81.834.881.940.0005880.000197
计算结果表明:位移很小,层间相对位移小于500/1002.0,顶点相对位移650/1000197.0/H,
所以满足要求
⑤内力计算:
A柱的弯矩计算:
六层柱:mkNM00.343.12.13.3
61
上
mkNM72.143.12.1
61
下
mkNM65.39.138.13.3
62
上
mkNM62.29.138.1
62
下
mkNM57.22.116.13.3
63
上
mkNM39.12.116.1
63
下
五层柱:mkNM76.65.337.13.3
51
上
mkNM8.45.337.1
51
下
mkNM42.865.449.13.3
52
上
mkNM93.665.449.1
52
下
mkNM80.593.232.13.3
53
上
mkNM87.393.232.1
53
下
四层柱:mkNM83.943.549.13.3
41
上
mkNM09.843.549.1
41
下
mkNM3.1299.654.13.3
42
上
mkNM76.1099.654.1
42
下
mkNM24.855.449.13.3
43
上
mkNM78.655.449.1
43
下
三层柱:mkNM74.122.753.13.3
31
上
mkNM02.112.753.1
31
下
mkNM31.1528.965.13.3
32
上
mkNM31.1528.965.1
32
下
mkNM87.1004.65.13.3
33
上
mkNM06.904.65.1
33
下
二层柱:mkNM7.1491.865.13.3
21
上
mkNM7.1491.865.1
21
下
mkNM94.1848.1165.13.3
22
上
mkNM94.1848.1165.1
22
下
mkNM34.1248.765.13.3
23
上
mkNM34.1248.765.1
23
下
一层柱:mkNM60.2324.117.28.4
11
上
mkNM35.3024.117.2
11
下
mkNM47.2818.1364.28.4
12
上
mkNM8.3418.1364.2
12
下
mkNM19.2046.1087.28.4
13
上
mkNM02.3046.1087.2
13
下
B、梁的弯矩计算:
顶层梁:
mkNMM
kl
00.3
6108
上左
mkNMM
KL
01.276.24.3/4.3
62
08
上
右
mkNMM
KL
64.176.24.3/76.2
62
03
上
左
mkNMM
KL
5.2
63
03
上
右
六层梁:
mkNMMM
kl
48.8)(
516108
上下左
mkNMMM
KL
09.676.24.3/4.3)(
5262
08
上下
右
mkNMMM
KL
95.476.24.3/76.2)(
5262
03
上下
左
mkNMMM
KL
19.7)(
5363
03
上下
右
五层梁:
mkNMMM
kl
63.14)(
415108
上
下左
mkNMMM
KL
61.1076.24.3/4.3)(
4252
08
上
下
右
mkNMMM
KL
62.876.24.3/76.2)(
4252
03
上
下
左
mkNMMM
KL
11.12)(
4353
03
上下
右
四层梁:
mkNMMM
kl
83.20)(
314108
上
下
左
mkNMMM
KL
39.1476.24.3/4.3)(
3242
08
上
下
右
mkNMMM
KL
68.1176.24.3/76.2)(
3242
03
上
下
左
mkNMMM
KL
65.17)(
3343
03
上下
右
三层梁:
mkNMMM
kl
72.25)(
213108
上
下左
mkNMMM
KL
90.1876.24.3/4.3)(
2232
08
上
下
右
mkNMMM
KL
35.1576.24.3/76.2)(
2232
03
上
下
左
mkNMMM
KL
4.21)(
2333
03
上下
右
二层梁:
mkNMMM
kl
8.30)(
112108
上下
左
mkNMMM
KL
17.2676.24.3/4.3)(
1222
08
上下
右
mkNMMM
KL
24.2176.24.3/76.2)(
1222
03
上下
左
mkNMMM
KL
53.32)(
1323
03
上下
右
C、梁的跨中弯矩
顶层梁:
mkNM
kl
50.02/)01.20.3(
08
mkNM
KL
43.02/)5.264.1(
03
六层梁:
mkNM
kl
2.12/)09.648.8(
08
mkNM
KL
12.12/)19.795.4(
03
五层梁:
mkNM
kl
01.22/)61.1063.14(
08
mkNM
KL
74.12/)11.1263.8(
03
四层梁:
mkNM
kl
01.22/)61.1063.14(
08
mkNM
KL
74.12/)11.1263.8(
03
三层梁:
mkNM
kl
41.32/)90.1872.25(
08
mkNM
KL
03.32/)4.2135.15(
03
二层梁:
mkNM
kl
32.22/)17.268.30(
08
mkNM
KL
65.52/)53.3224.21(
03
D、梁的剪力计算:
顶层梁:
kNVV
klkl
28.19.3/)01.20.3(
0808
右左
kNVV
klkl
86.08.4/)5.264.1(
0303
右左
六层梁:
kNVV
klkl
74.39.3/)09.648.8(
0808
右左
kNVV
klkl
53.28.4/)19.795.4(
0303
右左
五层梁:
kNVV
klkl
47.69.3/)61.1063.14(
0808
右左
kNVV
klkl
32.48.4/)11.1262.8(
0303
右左
四层梁:
kNVV
klkl
03.99.3/)39.1483.20(
0808
右左
kNVV
klkl
12.68.4/)65.1768.11(
0303
右左
三层梁:
kNVV
klkl
44.119.3/)90.1872.25(
0808
右左
kNVV
klkl
66.78.4/)40.2135.15(
0303
右左
二层梁:
kNVV
klkl
61.149.3/)17.268.30(
0808
右左
kNVV
klkl
20.118.4/)53.3224.21(
0303
右左
E、柱的轴心力计算:
六层柱:kNN28.1
1
kNN42.028.186.0
2
kNN86.0
3
五层柱:kNN02.5)74.328.1(
1
kNN63.153.274.342.0
2
kNN39.353.286.0
3
四层柱:kNN49.11)47.602.5(
1
kNN78.332.447.663.1
2
kNN71.732.439.3
3
三层柱:kNN52.20)03.949.11(
1
kNN69.612.603.978.3
2
kNN83.1312.671.7
3
二层柱:kNN96.31)44.1152.20(
1
kNN47.1066.744.1169.6
2
kNN49.2166.783.13
3
一层柱:kNN57.46)61.1496.31(
1
kNN88.1320.1161.1447.10
2
kNN69.3220.1149.21
3
E、画内力图
2.9竖向恒荷载作用下框架的内力计算
2.9.1内力计算:
①03WKL:A、板05WB传来的恒荷载:mkN/61.6737.095.16.4
B、板03WB传来的恒荷载:mkN/77.6701.01.26.4
C、梁自重:mkN/76.2162)1.05.0(02.025)1.05.0(25.0
②08WKL:A、板06WB传来的恒荷载:mkN/61.5625.095.16.4
B、板04WB传来的恒荷载:mkN/00.6699.095.16.4
C、梁自重:mkN/76.2162)1.05.0(02.025)1.05.0(25.0
③05PL:A、次梁02WL传来的集中力:kNV05.3
B、次梁01WL传来的集中力:kNV29.3
C、梁自重:mkN/76.2162)1.05.0(02.025)1.05.0(25.0
④03KL:A、板05B传来的恒荷载:mkN/61.2701.005.155.3
B、板03B传来的恒荷载:mkN/66.3860.02.155.3
C、板10B传来的恒荷载:mkN/10.5737.095.155.3
D、梁自重:mkN/76.2162)1.05.0(02.025)1.05.0(25.0
E、墙自重:mkN/18.8162)5.03.3(02.019)5.03.3(12.0
F、次梁07L传来的集中力:kNV44.44
⑤08KL:A、板11B传来的恒荷载:mkN/33.4625.095.155.3
B、板09B传来的恒荷载:mkN/82.2756.005.155.3
C、梁自重:mkN/76.2162)1.05.0(02.025)1.05.0(25.0
D、墙自重:mkN/18.8162)5.03.3(02.019)5.03.3(12.0
E、次梁05L传来的集中力:kNV17.42
⑥01PL:A、次梁08L传来的集中力:kNV39.7
B、梁自重:mkN/76.2162)1.05.0(02.025)1.05.0(25.0
C、墙自重:mkN/07.316205.102.01905.112.0
2.9.2由以上可得出框架在恒荷载作用下的受力图如下:
2.9.3求分配系数:
①顶层结点:
59.0)64.24.384.8/(84.8
1
左A
23.0)64.24.384.8/(4.3
1
右A
18.0)64.24.384.8/(64.2
1
下A
39.0)64.24.376.2/(4.3
2
左A
31.0)64.24.376.2/(76.2
2
右A
30.0)64.24.376.2/(64.2
2
下A
19.0)64.284.876.2/(76.2
3
左A
62.0)64.284.876.2/(84.8
3
左A
19.0)64.284.876.2/(64.2
3
下A
②52层结点:15.0)64.24.364.284.8/(64.2
1
1
下
上
i
i
50.0)64.24.364.284.8/(84.8
1
左i
19.0)64.24.364.284.8/(4.3
1
右i
23.0)64.24.364.276.2/(64.2
2
2
下
上
i
i
30.0)64.24.364.276.2/(4.3
2
左i
30.0)64.24.364.276.2/(76.2
2
右i
33.0)64.264.276.2/(64.2
3
3
下
上
i
i
34.0)64.264.276.2/(76.2
3
左i
③一层结点:
53.0)82.14.364.284.8/(84.8
1
左F
2.0)82.14.364.284.8/(4.3
1
右F
16.0)82.14.364.284.8/(64.2
1
上F
11.0)82.14.364.284.8/(82.1
1
下F
32.0)82.14.364.276.2/(4.3
2
左F
25.0)82.14.364.276.2/(76.2
2
右F
25.0)82.14.364.276.2/(64.2
2
上F
17.0)82.14.364.276.2/(82.1
2
下F
38.0)82.164.276.2/(76.2
3
左F
37.0)82.164.276.2/(64.2
3
上F
25.0)82.164.276.2/(82.1
3
下F
2.9.4计算梁的固端弯矩:(不分正负)
①顶层:
mkNMMF
A
F
A
72.70.134.60.176.22/12
31右左
mkNMMF
A
F
A
21.189.337.1412/12
21左右
mkNMMF
A
F
A
99.308.414.1612/12
32左右
②61层:
mkNMF
i
46.155.139.75.183.52/12
1左
mkNMF
i
71.339.3/2.17.217.429.309.1812/1222
1右
mkNMF
i
18.479.3/7.22.117.429.309.1812/1222
2左
mkNMF
i
49.648.4/4.24.244.448.470.1912/1222
2右
mkNMF
i
49.648.4/4.24.244.448.470.1912/1222
3左
2.9.5根据弯矩分配法计算框架力,可得下表:
左梁上柱下柱右梁左梁上柱下柱右梁左梁上柱下柱右梁
2.9.6将梁端弯矩进行折减:(折减系数为0.9)
①顶层:
mkNM
A
47.109.063.11
1左
mkNM
A
77.129.019.14
1右
mkNM
A
62.219.002.24
2左
mkNM
A
59.269.054.29
2右
mkNM
A
17.279.019.30
3左
mkNM
A
10.159.078.16
2右
②六层:
mkNM
B
92.199.013.22
1左
mkNM
B
72.259.058.28
1右
mkNM
B
13.509.070.55
2左
mkNM
B
02.639.002.70
2右
mkNM
B
47.439.030.48
3左
③五层:
mkNM
C
73.199.092.21
1左
mkNM
C
79.259.066.28
1右
mkNM
C
11.509.068.55
2左
mkNM
C
58.639.064.70
2右
mkNM
C
05.469.017.51
3左
④四层:
mkNM
D
73.199.092.21
1左
mkNM
D
79.259.066.28
1右
mkNM
D
11.509.068.55
2左
mkNM
D
58.639.064.70
2右
mkNM
D
05.469.017.51
3左
⑤三层:
mkNM
E
68.199.087.21
1左
mkNM
E
81.259.068.28
1右
mkNM
E
17.509.063.55
2左
mkNM
E
07.639.008.70
2右
mkNM
E
45.469.061.51
3左
⑥二层:
mkNM
F
65.209.094.22
1左
mkNM
F
31.259.012.28
1右
mkNM
F
52.519.024.57
2左
mkNM
F
28.639.031.70
2右
mkNM
F
83.409.037.45
3左
2.9.7计算跨中最大弯矩:
①顶层:
mkNM
WKL
13.10)62.2177.12(2/19.337.148/12
08
mkNM
WKL
60.19)17.2759.26(2/18.414.168/12
03
②六层:
mkNM
KL
50.31)13.5072.25(2/19.3/7.22.117.429.309.188/12
08
mkNM
KL
82.56)47.4302.63(2/18.4/4.24.244.448.470.198/12
03
③五层:
mkNM
KL
48.31)11.5079.25(2/19.3/7.22.117.429.309.188/12
08
mkNM
KL
24.55)05.4658.63(2/18.4/4.24.244.448.470.198/12
03
④四层:
mkNM
KL
48.31)11.5081.25(2/19.3/7.22.117.429.309.188/12
08
mkNM
KL
24.55)05.4607.63(2/18.4/4.24.244.448.470.198/12
03
⑤三层:
mkNM
KL
44.31)17.5081.25(2/19.3/7.22.117.429.309.188/12
08
mkNM
KL
30.55)45.4607.63(2/18.4/4.24.244.448.470.198/12
03
⑥二层:
mkNM
KL
01.31)52.5131.25(2/19.3/7.22.117.429.309.188/12
08
mkNM
KL
01.58)83.4028.63(2/18.4/4.24.244.448.470.198/12
03
2.9.8故该框架在恒荷载作用下的框架梁内力图如下:
2.9.9计算梁端剪力:
①顶层:
kNV
A
1.90.176.234.6
1
左
kNVV
AA
75.259.3/)62.2177.12(9.337.142/1
21
kNVV
AA
29.309.3/)62.2177.12(9.337.142/1
12
kNVV
AA
62.388.4/)17.2759.26(8.437.142/1
32
kNVV
AA
86.388.4/)17.2759.26(8.437.142/1
23
kNV
A
58.30.176.234.6
3
右
②六层:
kNV
B
14.165.183.539.7
1
左
kNVV
BB
99.419.3/)13.5072.25(9.3/2.117.429.309.182/1
21
kNVV
BB
73.709.3/)13.5072.25(9.3/2.117.429.309.182/1
12
kNVV
BB
57.738.4/)47.4302.63(8.4/4.244.448.470.192/1
32
kNVV
BB
43.658.4/)47.4302.63(8.4/4.244.448.470.192/1
23
③五层:kNV
C
14.165.183.539.7
1
左
kNVV
CC
01.429.3/)11.5079.25(9.3/2.117.429.309.182/1
21
kNVV
CC
71.709.3/)11.5079.25(9.3/2.117.429.309.182/1
12
kNVV
CC
15.738.4/)05.4658.63(8.4/4.244.448.470.192/1
32
kNVV
CC
85.658.4/)05.4658.63(8.4/4.244.448.470.192/1
23
④四层:
kNV
D
14.165.183.539.7
1
左
kNVV
DD
01.429.3/)11.5079.25(9.3/2.117.429.309.182/1
21
kNVV
DD
71.709.3/)11.5079.25(9.3/2.117.429.309.182/1
12
kNVV
DD
15.738.4/)05.4658.63(8.4/4.244.448.470.192/1
32
kNVV
DD
85.658.4/)05.4658.63(8.4/4.244.448.470.192/1
23
⑤三层:
kNV
E
14.165.183.539.7
1
左
kNVV
EE
00.429.3/)17.5081.25(9.3/2.117.429.309.182/1
21
kNVV
EE
72.709.3/)17.5081.25(9.3/2.117.429.309.182/1
12
kNVV
EE
96.728.4/)45.4607.63(8.4/4.244.448.470.192/1
32
kNVV
EE
04.668.4/)45.4607.63(8.4/4.244.448.470.192/1
23
⑥二层:
kNV
F
14.165.183.539.7
1
左
kNVV
FF
53.419.3/)52.5131.25(9.3/2.117.429.309.182/1
21
kNVV
FF
19.719.3/)52.5131.25(9.3/2.117.429.309.182/1
12
kNVV
FF
18.748.4/)83.4028.63(8.4/4.244.448.470.192/1
32
kNVV
FF
82.648.4/)83.4028.63(8.4/4.244.448.470.192/1
23
2.9.10计算柱的轴心力:
①六层:kNVVVN
AA
A
85.3475.251.9
21
1
1
左
kNVVVVN
AAAA
91.6862.3829.30
32122
kNVVVN
AAA
44.4258.386.38
2233
右
②五层:kNVVVVVVN
BB
B
AA
A
98.9299.4114.1675.251.9
21
1
21
1
1
左左
kNVVVVVVVVN
BBBBAAAA
21.21357.7373.7062.3829.30
321232122
kNVVVVVN
BBAAA
87.10743.6558.386.38
232233
右
③四层:
14.1699.4114.1675.251.9
21
1
21
1
21
1
1
CC
C
BB
B
AA
A
VVVVVVVVVN
左左左
kN13.15101.42
57.7373.7062.3829.30
32
CCCCBBBBAAAA
VVVVVVVVVVVVN
kN07.35715.7371.70
kNVVVVVVVN
CCBBAAA
72.17385.6543.6558.386.38
23232233
右
④三层:
14.1675.251.9
21
1
21
1
21
1
21
1
1
DD
D
CC
C
BB
B
AA
A
VVVVVVVVVVVVN
左左左左
kN28.20901.4214.1601.4214.1699.41
62.3829.30
322122
DDDDCCCCBBBBAAAA
VVVVVVVVVVVVVVVVN
kN93.50015.7371.7015.7371.7057.7373.70
85.6585.6543.6558.386.38
2323232233
DDCCBBAAA
VVVVVVVVVN
右
kN57.239
⑤二层:
1.9
21
1
21
1
21
1
21
1
21
1
1
EE
E
DD
D
CC
C
BB
B
AA
A
VVVVVVVVVVVVVVVN
左左左左左
kN42.26700.4214.1601.4214.1601.4214.1699.4114.1675.25
3221232122EEEEDDDDCCCCBBBBAAAA
VVVVVVVVVVVVVVVVVVVVN
96.7272.7015.7371.7015.7371.7057.7373.7062.3829.30
kN61.644
85.6543.6558.386.38
232323232233
EEDDCCBBAAA
VVVVVVVVVVVN
右
kN61.30504.6685.65
⑥一层:
左左左左左左1
21
1
21
1
21
1
21
1
21
1
1
F
EE
E
DD
D
CC
C
BB
B
AA
A
VVVVVVVVVVVVVVVVN
00.4214.1601.4214.1601.4214.1699.4114.1675.251.9
21
FF
VV
kN09.32553.4114.16
3221232122EEEEDDDDCCCCBBBBAAAA
VVVVVVVVVVVVVVVVVVVVN
15.7371.7015.7371.7057.7373.7062.3829.30
3212
FFFF
VVVV
kN98.78918.7419.7196.7272.70
43.6558.386.38
23232323232233
FFEEDDCCBBAAA
VVVVVVVVVVVVVN
右
kN43.37082.6404.6685.6585.65
2.10竖向活荷载作用下框架的内力计算
2.10.1内力计算:
①03WKL:A、板05WB传来的活荷载:mkN/87.2737.095.10.2
B、板03WB传来的活荷载:mkN/94.2701.01.20.2
②08WKL:A、板06WB传来的活荷载:mkN/44.2625.095.10.2
B、板04WB传来的活荷载:mkN/61.2699.095.10.2
③05PL:A、次梁02WL传来的集中力:kNV03.2
④03KL:A、板05B传来的活荷载:mkN/47.1701.005.10.2
B、板03B传来的活荷载:mkN/06.2860.02.10.2
C、板10B传来的活荷载:mkN/87.2737.095.10.2
D、次梁07L传来的集中力:kNV3.8
⑤08KL:A、板11B传来的活荷载:mkN/44.2625.095.10.2
B、板09B传来的活荷载:mkN/59.1756.005.10.2
C、次梁05L传来的集中力:kNV25.8
⑥01PL:A、次梁08L传来的集中力:kNV93.2
2.10.2由以上可得出框架在恒荷载作用下的受力图如下:
2.10.3求分配系数:(同竖向恒荷载)
2.10.4计算梁的固端弯矩:(不分正负)
①顶层:
mkNMMF
A
F
A
95.10.195.1
31右左
mkNMMF
A
F
A
4.69.305.512/12
21左右
mkNMMF
A
F
A
4.58.481.512/12
32左右
②61层:
mkNMF
i
4.45.193.2
1左
mkNMF
i
22.79.3/2.17.225.89.303.412/1222
1右
mkNMF
i
85.99.3/7.22.125.89.303.412/1222
2左
mkNMF
i
45.148.4/4.24.23.88.493.412/1222
2右
mkNMF
i
45.148.4/4.24.23.88.493.412/1222
3左
2.10.5根据弯矩分配法计算框架力,可得下表:
左梁上柱下柱右梁左梁上柱下柱右梁左梁上柱下柱右梁
2.10.6将梁端弯矩进行折减:(折减系数为0.9)
①顶层:
mkNM
A
14.49.060.4
1左
mkNM
A
03.59.059.5
1右
mkNM
A
62.59.024.6
2左
mkNM
A
63.59.025.6
2右
mkNM
A
58.49.009.5
3左
mkNM
A
30.29.055.2
2右
②六层:
mkNM
B
64.49.016.5
1左
mkNM
B
62.59.024.6
1右
mkNM
B
84.109.004.12
2左
mkNM
B
83.139.037.15
2右
mkNM
B
74.99.082.10
3左
③五层:
mkNM
C
73.49.025.5
1左
mkNM
C
59.59.021.6
1右
mkNM
C
66.109.084.11
2左
mkNM
C
98.139.053.15
2右
mkNM
C
37.109.052.11
3左
④四层:
mkNM
D
73.49.025.5
1左
mkNM
D
59.59.021.6
1右
mkNM
D
66.109.084.11
2左
mkNM
D
98.139.053.15
2右
mkNM
D
37.109.052.11
3左
⑤三层:
mkNM
E
73.49.025.5
1左
mkNM
E
59.59.021.6
1右
mkNM
E
64.109.082.11
2左
mkNM
E
99.139.054.15
2右
mkNM
E
46.109.062.11
3左
⑥二层:
mkNM
F
85.49.039.5
1左
mkNM
F
50.59.011.6
1右
mkNM
F
0.119.022.12
2左
mkNM
F
0.149.056.15
2右
mkNM
F
20.99.022.10
3左
2.10.7计算跨中最大弯矩:
①顶层:
mkNM
WKL
28.4)62.503.5(2/19.305.58/12
08
mkNM
WKL
44.9)58.463.5(2/18.481.58/12
03
②六层:
mkNM
KL
29.6)84.1062.5(2/19.3/7.22.125.89.303.48/12
08
mkNM
KL
37.12)74.983.13(2/18.4/4.24.23.88.493.48/12
03
③五层:
mkNM
KL
39.6)66.1059.5(2/19.3/7.22.125.89.303.48/12
08
mkNM
KL
98.11)37.1098.13(2/18.4/4.24.23.88.493.48/12
03
④四层:
mkNM
KL
39.6)64.1059.52/19.3/7.22.125.89.303.48/12
08
mkNM
KL
98.11)37.1098.13(2/18.4/4.24.23.88.493.48/12
03
⑤三层:
mkNM
KL
40.6)64.1059.5(2/19.3/7.22.125.89.303.48/12
08
mkNM
KL
93.11)46.1099.13(2/18.4/4.24.23.88.493.48/12
03
⑥二层:
mkNM
KL
27.6)0.1150.5(2/19.3/7.22.125.89.303.48/12
08
mkNM
KL
56.12)2.90.14(2/18.4/4.24.23.88.493.48/12
03
2.10.8故该框架在活荷载作用下的框架梁内力如下:
2.10.9计算梁端剪力:
①顶层:
kNV
A
03.2
1
左
kNVV
AA
70.99.3/)62.503.5(9.305.52/1
21
kNVV
AA
00.109.3/)62.503.5(9.305.52/1
12
kNVV
AA
16.148.4/)58.463.5(8.481.52/1
32
kNVV
AA
73.138.4/)58.463.5(8.481.52/1
23
kNV
A
03.2
3
右
②六层:
kNV
B
93.2
1
左
kNVV
BB
06.99.3/)84.1062.5(9.3/2.125.89.303.42/1
21
kNVV
BB
91.149.3/)84.1062.5(9.3/2.125.89.303.42/1
12
kNVV
BB
83.168.4/)74.983.13(8.4/4.23.88.493.42/1
32
kNVV
BB
13.158.4/)74.983.13(8.4/4.23.88.493.42/1
23
③五层:kNV
C
93.2
1
左
kNVV
CC
10.99.3/)66.1059.5(9.3/2.125.89.303.42/1
21
kNVV
CC
87.149.3/)66.1059.5(9.3/2.125.89.303.42/1
12
kNVV
CC
73.168.4/)37.1098.13(8.4/4.23.88.493.42/1
32
kNVV
CC
23.158.4/)37.1098.13(8.4/4.23.88.493.42/1
23
④四层:kNV
D
93.2
1
左
kNVV
DD
10.99.3/)66.1059.5(9.3/2.125.89.303.42/1
21
kNVV
DD
87.149.3/)66.1059.5(9.3/2.125.89.303.42/1
12
kNVV
DD
73.168.4/)37.1098.13(8.4/4.23.88.493.42/1
32
kNVV
DD
23.158.4/)37.1098.13(8.4/4.23.88.493.42/1
23
⑤三层:
kNV
E
93.2
1
左
kNVV
EE
10.99.3/)64.1059.5(9.3/2.125.89.303.42/1
21
kNVV
EE
86.149.3/)64.1059.5(9.3/2.125.89.303.42/1
12
kNVV
EE
72.168.4/)46.1099.13(8.4/4.23.88.493.42/1
32
kNVV
EE
25.158.4/)46.1099.13(8.4/4.23.88.493.42/1
23
⑥二层:
kNV
F
93.2
1
左
kNVV
FF
18.129.3/)0.1150.5(9.3/2.125.89.303.42/1
21
kNVV
FF
96.149.3/)0.1150.5(9.3/2.125.89.303.42/1
12
kNVV
FF
98.168.4/)20.90.14(8.4/4.23.88.493.42/1
32
kNVV
FF
98.148.4/)20.90.14(8.4/4.23.88.493.42/1
23
2.10.10计算柱的轴心力:
①六层:
kNVVVN
AA
A
73.1170.903.2
21
1
1
左
kNVVVVN
AAAA
16.2416.140.10
32122
kNVVVN
AAA
76.1503.273.13
2233
右
②五层:kNVVVVVVN
BB
B
AA
A
72.2306.993.270.903.2
21
1
21
1
1
左左
kNVVVVVVVVN
BBBBAAAA
9.5583.1691.1416.140.10
321232122
kNVVVVVN
BBAAA
89.3013.1503.273.13
232233
右
③四层:93.206.993.270.903.2
21
1
21
1
21
1
1
CC
C
BB
B
AA
A
VVVVVVVVVN
左左左
kN75.3510.9
83.1691.1416.140.10
32
CCCCBBBBAAAA
VVVVVVVVVVVVN
kN5.8773.1687.14
kNVVVVVVVN
CCBBAAA
12.4623.1513.1503.273.13
23232233
右
④三层:
93.270.903.2
21
1
21
1
21
1
21
1
1
DD
D
CC
C
BB
B
AA
A
VVVVVVVVVVVVN
左左左左
kN78.4710.993.26.993.26.9
16.140.10
322122
DDDDCCCCBBBBAAAA
VVVVVVVVVVVVVVVVN
kN1.11973.1687.1473.1687.1483.1691.14
23.1523.1513.1503.273.13
2323232233
DDCCBBAAA
VVVVVVVVVN
右
kN35.61
⑤二层:
03.2
21
1
21
1
21
1
21
1
21
1
1
EE
E
DD
D
CC
C
BB
B
AA
A
VVVVVVVVVVVVVVVN
左左左左左
kN81.5910.993.210.993.210.993.26.993.270.9
3221232122EEEEDDDDCCCCBBBBAAAA
VVVVVVVVVVVVVVVVVVVVN
72.1686.1473.1687.1473.1687.1483.1691.1416.140.10
kN68.150
23.1513.1503.273.13
232323232233
EEDDCCBBAAA
VVVVVVVVVVVN
右
kN6.7625.1523.15
⑥一层:
左左左左左左1
21
1
21
1
21
1
21
1
21
1
1
F
EE
E
DD
D
CC
C
BB
B
AA
A
VVVVVVVVVVVVVVVVN
10.993.210.993.210.993.26.993.270.903.2
21
FF
VV
kN84.7118.1293.2
3221232122EEEEDDDDCCCCBBBBAAAA
VVVVVVVVVVVVVVVVVVVVN
73.1687.1473.1687.1483.1691.1416.140.10
3212
FFFF
VVVV
kN62.18298.1696.1472.1686.14
13.1503.273.13
23232323232233
FFEEDDCCBBAAA
VVVVVVVVVVVVVN
右
kN58.9198.1425.1523.1523.15
2.11纵向框架的内力计算
2.11.1纵向屋面框架梁的计算:
①06PL:
A、荷载计算:a、梁的自重:mkN/76.2216)1.05.0(02.025)1.05.0(25.0
b、次梁02WL和04WL传来的恒荷载集中力:kNV81.676.305.3
c、次梁02WL和04WL传来的活荷载集中力:kNV18.22.198.0
合计:kNV22.1118.24.181.62.1
mkNg/31.376.22.1
B、梁端弯矩计算:mkNM88.120.122.110.131.32/12
②13WKL:
A、荷载计算:a、梁的自重:mkN/76.2216)1.05.0(02.025)1.05.0(25.0
b、板02WB传来的恒荷载:mkN/0.6669.095.16.4
c、板02WB传来的活荷载:mkN/61.2669.095.10.2
d、板01WB传来的恒荷载:mkN/77.6701.01.26.4
e、板01WB传来的活荷载:mkN/94.2701.01.20.2
合计:mkNg/41.26)94.261.2(4.1)77.60.676.2(2.1
B、梁端弯矩计算:mkNM82.382.441.2612/12
③16WKL:同13WKL
④19WKL:
A、荷载计算:a、梁的自重:mkN/76.2216)1.05.0(02.025)1.05.0(25.0
b、板06WB传来的恒荷载:mkN/61.5625.095.16.4
c、板06WB传来的活荷载:mkN/44.2625.095.10.2
d、板05WB传来的恒荷载:mkN/61.6737.095.16.4
e、板05WB传来的活荷载:mkN/87.2737.01.20.2
合计:mkNg/41.25)87.244.2(4.1)61.661.576.2(2.1
B、梁端弯矩计算:mkNM21.329.341.2512/12
⑤22WKL:
A、荷载计算:a、梁的自重:mkN/76.2216)1.05.0(02.025)1.05.0(25.0
b、板16WB传来的恒荷载:mkN/33.2864.076.06.4
c、板16WB传来的活荷载:mkN/31.1864.076.00.2
d、板07WB传来的恒荷载:mkN/37.5864.035.16.4
e、板07WB传来的活荷载:mkN/33.2864.035.10.2
合计:mkNg/65.17)33.231.1(4.1)37.533.276.2(2.1
B、梁端弯矩计算:mkNM72.107.265.1712/12
2.11.2纵向楼面框架梁的计算:
①13KL:
A、荷载计算:a、梁的自重:mkN/76.2216)1.05.0(02.025)1.05.0(25.0
b、板02B传来的恒荷载:mkN/63.4669.095.155.3
c、板02B传来的活荷载:mkN/61.2669.095.10.2
d、板01B传来的恒荷载:mkN/23.5701.01.255.3
e、板01B传来的活荷载:mkN/94.2701.01.20.2
合计:mkNg/91.22)94.261.2(4.1)23.563.476.2(2.1
B、梁端弯矩计算:mkNM68.332.491.2212/12
②16KL:
A、荷载计算:a、梁的自重:mkN/76.2216)1.05.0(02.025)1.05.0(25.0
b、板06B传来的恒荷载:mkN/23.1771.045.055.3
c、板06B传来的活荷载:mkN/69.0771.045.00.2
d、板07B传来的恒荷载:mkN/6.145.055.3
e、板07B传来的活荷载:mkN/9.045.00.2
f、板04B传来的恒荷载:mkN/83.1859.06.055.3
g、板04B传来的活荷载:mkN/03.1859.06.00.2
h、板05B传来的恒荷载:mkN/61.2701.005.155.3
i、板05B传来的活荷载:mkN/47.1701.005.10.2
j、次梁02L的恒荷载集中力:kNV1.3
k、次梁02L的活荷载集中力:kNV21.0
l、次梁03L的恒荷载集中力:kNV62.19
m、次梁03L的活荷载集中力:kNV5.8
mkNMF35.382.4/1.21.244.352.4/3.39.00.42.492.1112/122222
左
mkNMF73.362.4/1.21.244.352.4/9.03.30.42.492.1112/122222
右
③19KL:
A、荷载计算:a、梁的自重:mkN/76.2216)1.05.0(02.025)1.05.0(25.0
b、板11B传来的恒荷载:mkN/33.4625.095.155.3
c、板11B传来的活荷载:mkN/44.2625.095.10.2
d、板10B传来的恒荷载:mkN/1.5737.095.155.3
e、板10B传来的活荷载:mkN/87.2737.095.10.2
合计:mkNg/06.22)87.244.2(4.1)1.533.476.2(2.1
B、梁端弯矩计算:mkNM96.279.306.2212/12
④22KL:
A、荷载计算:a、梁的自重:mkN/76.2216)1.05.0(02.025)1.05.0(25.0
b、板16B传来的恒荷载:mkN/33.2864.076.055.3
c、板16B传来的活荷载:mkN/31.1864.076.00.2
d、次梁04L的恒荷载集中力:kNV29.21
e、次梁04L的活荷载集中力:kNV24.3
合计:mkNg/94.731.14.1)33.276.2(2.1
kNV08.3024.34.129.212.1
B、梁端弯矩计算:
mkNMMFF98.147.2/35.135.108.307.294.712/1222
右左
2.11.3纵向荷载作用下屋面梁的内力图:
2.11.4纵向荷载作用下楼面梁的内力图:
2.12框架内力组合
2.12.1梁的内力组合:
层
数
杆
件
截
面
内
力
各种荷载作用下的内力值内力组合值内力
设计值
恒荷载活荷载风载①②③
顶
层
PL
05
右
端
M10.474.1418.3612.5617.4918.36
V-9.10-2.03-13.76-10.92-13.34-13.76
W
K
L
1
8
左
端
M-12.77-5.03-3.00-22.37-19.52-24.88-24.88
V25.759.701.2844.4832.6943.9744.48
中M10.134.280.5018.1512.8617.8418.15
右
端
M21.625.622.0133.8128.7635.0235.02
V-30.29-10.00-1.28-50.35-38.14-49.77-50.35
W
K
L
1
3
左
端
M-26.59-5.63-1.64-39.79-34.20-40.56-40.56
V38.6214.160.8666.1747.5564.2266.17
中M19.609.440.4336.7424.1235.2736.74
右
端
M27.174.582.539.0236.1041.0341.03
V-38.86-13.73-0.86-65.85-47.84-63.99-65.85
PL
05
左
端
M-15.10-2.30-21.34-18.12-20.86-21.34
V3.582.037.144.306.717.14
六
层
PL
05
右
端
M19.924.6430.423.9029.4330.4
V-16.14-2.93-23.47-19.37-22.85-23.47
K
L
0
8
左
端
M-25.72-5.62-8.48-38.73-42.74-47.64-47.64
V41.999.063.7463.0755.6265.6265.62
中M31.506.291.246.6139.4846.7146.71
右
端
M50.1310.846.0975.3368.6880.3080.30
V-70.73-14.91-3.74-105.75-90.11-107.07-107.07
K
L
0
3
左
端
M-63.02-13.83-4.95-94.99-82.55-97.97-97.97
V73.5716.832.53111.8591.83111.32111.85
中M56.8212.371.1285.5069.7584.2485.50
右
端
M43.479.747.1965.8062.2372.3172.31
V-65.43-15.13-2.53-99.70-82.06-99.53-99.70
五
层
PL
05
右
端
M19.734.7330.3023.6829.3030.30
V-16.14-2.93-23.47-19.37-22.85-23.47
K
L
0
8
左
端
M-25.79-5.59-14.63-38.77-51.43-55.01-55.01
V42.019.106.4763.1559.4768.9468.94
中M31.486.392.0146.7240.5947.7747.77
右
端
M50.1110.6610.6175.0674.9985.4485.44
V-70.71-14.87-6.47-105.67-93.91-110.25-110.25
K
L
0
3
左
端
M-63.58-13.98-8.62-95.87-88.36-103.19-103.19
V73.1516.734.32111.2093.83112.83112.83
中M55.2411.981.7483.0668.7282.6183.06
右
端
M46.0510.3712.1169.7872.2182.0182.01
V-65385-15.23-4.32-100.34-85.07-102.28-102.28
PL
05
右
端
M19.734.7330.3023.6829.3030.30
V-16.14-2.93-23.47-19.37-22.85-23.47
K左M-25.79-5.59-20.83-38.77-60.11-62.39-62.39
四
层
L
0
8
端V42.019.109.0363.1563.0571.9971.99
中M31.486.393.2246.7242.2849.2149.21
右
端
M50.1110.6614.3975.0680.2889.9489.94
V-70.71-14.87-9.03-105.67-97.50-113.29-113.29
K
L
0
3
左
端
M-63.58-13.98-11.68-95.87-92.65-106.83-106.83
V73.1516.736.12111.2096.35114.97114.97
中M55.2411.982.9983.0670.4784.1084.10
右
端
M46.0510.3717.6569.7879.9788.6088.60
V-65.85-15.23-6.12-100.34-87.59-104.43-104.43
三
层
PL
05
右
端
M19.684.7330.2423.6229.2430.24
V-16.14-2.93-23.47-19.37-22.85-23.47
K
L
0
8
左
端
M-25.81-5.59-25.72-38.80-66.98-68.23-68.23
V31.449.1011.4450.4753.7462.1762.17
中M42.006.403.4159.3655.1762.0762.07
右
端
M50.0710.6418.9074.9886.5495.2485.24
V-70.72-14.86-11.44-105.25-100.88-115.80-115.80
K
L
0
3
左
端
M-63.07-13.99-15.35-95.27-97.17-110.60-110.60
V72.9616.727.66110.9698.27116.56116.56
中M55.3011.933.0383.0670.6084.1684.16
右
端
M46.4510.4621.470.3885.793.6593.65
V-66.04-15.25-7.66-100.60-89.87-106.51-106.51
二
层
PL
05
右
端
M20.654.8531.5724.7830.5531.57
V-16.14-2.93-23.47-19.37-22.85-23.47
K
L
0
8
左
端
M-25.31-5.50-30.8-38.07-73.49-73.57-73.57
V41.5312.1814.6166.8970.2981.7281.72
中M31.016.272.3245.9940.4647.4347.43
右
端
M5105211.026.1777.2298.46106.06106.06
V-71.19-14.96-14.61-106.37-105.88-120.62-120.62
K左M-63.28-14.0-21.24-95.54-105.67-117.87-117.87
L
0
3
端V74.1816.9811.20112.79104.70122.55122.55
中M58.0112.565.6587.2077.5291.2891.28
右
端
M40.839.2032.5361.8894.5498.6598.65
V-64.82-14.98-11.20-98.76-93.46-108.94108.94
备注:表中式①4.12.1活载恒载
表中式②4.12.1风载恒载
表中式③85.04.1)(2.1风载活载恒载
2.12.2梁的配筋
2.12.3
楼
层
杆
件
截
面
弯矩
)(mkNM
S
A值
)(2mm
配
筋
实际配筋
)(2mm
剪力
kN配箍筋
顶
层
05PL右端18.362793Ф1233913.96Ф6@200
18WKL
左端24.882793Ф1233944.48Ф6@200
跨中18.152793Ф12339
右端35.022793Ф1233950.35Ф6@200
13WKL
左端40.563353Ф1233966.17Ф6@200
跨中36.742793Ф12339
右端41.033353Ф1233965.85Ф6@200
05PL左端21.342793Ф123397.14Ф6@200
六
01PL右端30.402793Ф1233923.47Ф6@200
18KL
左端47.643914Ф1245265.62Ф6@200
跨中46.713353Ф12339
层
右端80.306144Ф14615107.07Ф6@200
13KL
左端97.977814Ф16804111.85Ф6@200
跨中85.506704Ф16804
右端72.315584Ф1461599.70Ф6@200
五
层
01PL右端30.302793Ф1233923.47Ф6@200
18KL
左端55.014464Ф1245268.94Ф6@200
跨中47.773914Ф12452
右端85.446704Ф16804110.25Ф6@200
13KL
左端103.198374Ф181017112.83Ф6@200
跨中83.066704Ф16804
右端82.016704Ф16804102.28Ф6@200
四
层
01PL右端30.302793Ф1233923.47Ф6@200
18KL
左端62.395024Ф1461571.99Ф6@200
跨中49.213914Ф12452
右端89.947254Ф16804113.29Ф6@200
13KL
左端106.838374Ф181017114.97Ф6@200
跨中84.106704Ф16804
右端88.606704Ф16804104.43Ф6@200
三
层
01PL右端30.242793Ф1233923.47Ф6@200
18KL
左端68.235584Ф1461562.17Ф6@200
跨中62.075024Ф14615
右端95.247814Ф16804115.80Ф6@200
13KL
左端110.608934Ф181017116.56Ф6@200
跨中84.166704Ф16804
右端93.657254Ф16804106.51Ф6@200
二
01PL右端31.572793Ф1233923.47Ф6@200
18KL
左端73.575584Ф1461581.72Ф6@200
跨中47.433914Ф12452
右端106.068374Ф181017120.62Ф6@200
层13KL
左端117.879494Ф181017122.55Ф6@200
跨中91.287254Ф16804
右端98.657814Ф16804108.94Ф6@200
备注:加密区箍筋为Ф6@100
2.12.3框架柱的内力计算
①柱7Z的内力计算:
A、荷载计算:(由于横梁传来的荷载以及风荷载在前面已计算出来,故只计算纵向框架梁传来的荷载)
a、屋面纵向框架梁传来的恒荷载:kN73.3256.1517.17
b、屋面纵向框架梁传来的活荷载:kN15.736.379.3
c、楼面纵向框架梁传来的恒荷载:kN13.5985.1928.39
d、楼面纵向框架梁传来的活荷载:kN42.884.358.4
故7Z的恒荷载如下表:
柱7Z的恒荷载计算
层数层高横梁传来
的恒荷载
纵梁传来
的恒荷载
自重柱顶荷
载总和
柱底荷
载总和
六层3.334.2832.7316.767.0183.71
五层3.399.9359.1316.7159.06175.76
四层3.3165.5659.1316.7224.69241.39
三层3.3231.1959.1316.7290.32307.02
二层3.3296.8159.1316.7355.94372.64
一层4.8361.9959.1324.3421.12445.42
故7Z的活荷载如下表:
柱7Z的活荷载计算
层数层高横梁传来
的活荷载
纵梁传来
的活荷载
总和
六层3.311.737.1518.88
五层3.323.728.4232.14
四层3.335.758.4244.17
三层3.347.788.4256.20
二层3.359.818.4268.23
一层4.871.848.4280.26
②柱8Z的内力计算:
B、荷载计算:(由于横梁传来的荷载以及风荷载在前面已计算出来,故只计算纵向框架梁传来的荷载)
a、屋面纵向框架梁传来的恒荷载:kN69.3050.1419.16
b、屋面纵向框架梁传来的活荷载:kN01.1118.583.5
c、楼面纵向框架梁传来的恒荷载:kN72.6232.194.43
d、楼面纵向框架梁传来的活荷载:kN72.1243.529.7
故8Z的恒荷载如下表:
柱8Z的恒荷载计算
层数层高横梁传来
的恒荷载
纵梁传来
的恒荷载
自重柱顶荷
载总和
柱底荷
载总和
六层3.369.2430.6916.799.93116.63
五层3.3144.5662.7216.7207.28223.98
四层3.3288.5562.7216.7351.27367.97
三层3.3432.5462.7216.7495.26511.96
二层3.3576.4562.7216.7639.17655.87
一层4.8721.1662.7224.3783.88808.18
故8Z的活荷载如下表:
柱8Z的活荷载计算
层数层高横梁传来
的活荷载
纵梁传来
的活荷载
总和
六层3.324.1611.0135.17
五层3.355.9012.7268.62
四层3.387.5012.72100.22
三层3.3119.1012.72131.82
二层3.3150.6812.72163.40
一层4.8182.6212.72195.34
③柱9Z的内力计算:
C、荷载计算:(由于横梁传来的荷载以及风荷载在前面已计算出来,故只计算纵向框架梁传来的荷载)
a、屋面纵向框架梁传来的恒荷载:kN52.3454.1698.17
b、屋面纵向框架梁传来的活荷载:kN92.778.314.4
c、楼面纵向框架梁传来的恒荷载:kN89.3501.1888.17
d、楼面纵向框架梁传来的活荷载:kN57.480.277.1
故9Z的恒荷载如下表:
柱9Z的恒荷载计算
层数层高横梁传来
的恒荷载
纵梁传来
的恒荷载
自重柱顶荷
载总和
柱底荷
载总和
六层3.342.1934.5216.776.7193.41
五层3.3107.2335.8916.7143.12159.82
四层3.3130.6735.8916.7166.56183.26
三层3.3196.3035.8916.7232.19248.89
二层3.3262.0035.8916.7297.89314.59
一层4.8326.3735.8924.3362.26386.56
故9Z的活荷载如下表:
柱9Z的活荷载计算
层数层高横梁传来
的活荷载
纵梁传来
的活荷载
总和
六层3.315.767.9223.68
五层3.330.894.5735.46
四层3.346.124.5750.69
三层3.361.354.5765.92
二层3.376.604.5781.17
一层4.891.584.5796.15
2.12.4框架柱的内力组
层
数
杆
件
截
面
内
力
各种荷载作用下的内力值内力组合值
恒荷载活荷载风载①②③
六
层
7Z
柱
顶
M2.5613.04.477.277.83
V67.0118.881.28105.8682.20104.40
柱
底
M2.950.621.724.415.956.34
V83.7118.881.28126.88102.24124.44
8Z
柱
顶
M5.530.023.656.6611.7511.00
V99.9335.170.42169.12120.50162.27
柱
底
M7.121.322.6210.3912.2113.23
V116.6335.170.42189.19140.54182.31
9Z
柱
顶
M13.422.542.5719.6619.7022.18
V76.7123.680.86125.2093.26121.25
柱
底
M19.944.381.3930.0625.8730.79
V93.4123.680.86145.24113.30141.29
五
层
7Z
柱
顶
M3.370.446.764.6613.5112.61
V159.0632.145.02235.87197.90235.09
柱
底
M3.310.474.84.6310.6910.24
V75.7632.145.02255.91217.94255.13
8Z
柱
顶
M7.202.008.4211.4420.4321.04
V207.2868.621.63344.80251.02332.33
柱
底
M7.181.856.9311.2118.3219.06
V223.9868.621.63364.84271.06352.37
9Z
柱
顶
M28.376.445.8042.0642.1648.61
V143.1235.463.39221.39176.49217.98
柱
底
M25.595.763.8738.7736.1342.17
V159.8235.463.39241.43196.53238.02
四
层
7Z
柱
顶
M3.310.479.834.6317.7316.23
V241.3944.1711.49331.47285.71335.86
柱
底
M3.310.478.094.6315.3014.16
V241.3944.1711.49351.51305.75355.90
8Z
柱
顶
M7.181.8512.3011.2125.8425.45
V351.27100.223.78561.83426.82545.28
柱
底
M7.181.8510.7611.2123.6823.62
V367.97100.223.78581.87446.86565.32
9Z
柱
顶
M25.595.768.2438.7742.2447.37
V166.5650.697.71270.84210.67269.37
柱
底
M25.575.766.7838.7540.1845.61
V183.2650.697.71290.88230.71289.41
7Z
柱
顶
M3.310.4712.744.6321.8119.69
V290.3256.220.52427.06377.11439.68
柱M3.290.4711.024.6119.3817.62
三
层
底V307.025.6220.52376.29397.15399.53
8Z
柱
顶
M7.181.8515.3111.2130.0529.04
V495.26131.826.69778.86603.68759.14
柱
底
M7.141.8415.3111.1430.0028.98
V511.96131.826.69798.90623.72779.18
9Z
柱
顶
M25.595.7610.8738.7745.9350.50
V232.1965.9213.83370.92297.99373.53
柱
底
M25.165.7610.8738.1345.4149.87
V248.8965.9213.83390.96318.03393.57
二
层
7Z
柱
顶
M3.380.4814.74.7324.6422.12
V355.9468.2331.96522.65471.87546.35
柱
底
M3.630.5114.75.0724.9422.46
V372.6468.2331.96542.69491.91566.39
8Z
柱
顶
M7.311.8818.9411.4035.2933.55
V639.17163.4010.47995.76781.66973.91
柱
底
M8.432.1618.9413.1436.6335.23
V655.87163.4010.471015.80801.70993.95
9Z
柱
顶
M26.455.9512.3440.0749.0253.51
V297.8981.1721.49471.11387.55479.63
柱
底
M31.377.0612.3447.5354.9260.73
V314.5981.1721.49491.15407.59499.67
一
层
7Z
柱
顶
M1.550.2123.602.1534.9030.19
V421.1280.2646.57617.71570.54656.27
柱
底
M0.780.1030.351.0843.4337.17
V445.4280.26246.57646.87599.70685.43
8Z
柱
顶
M4.381.1128.476.8145.1140.46
V783.88195.3413.881214.13960.091189.63
柱
底
M2.190.5634.803.4151.3544.71
V808.18195.3413.881243.29989.251218.79
9Z
柱
顶
M14.003.1620.1921.2245.0744.59
V362.2696.1532.69569.32480.48588.03
柱
底
M7.001.5830.0210.6150.4346.00
V386.5696.1532.69598.48509.64617.19
备注:表中式①4.12.1活载恒载
表中式②4.12.1风载恒载
表中式③85.04.1)(2.1风载活载恒载
2.12.5框架柱正截面强度计算及配筋
①六层柱:
Z7柱Z8柱Z9柱
b450
h450
h54415
M7.837.274.4113.2311.7510.3930.7919.7030.06
N104.4082.20126.88182.31120.50189.19141.2993.26145.24
l0=3.3*1.254.134.134.134.134.134.134.134.134.13
e0=M÷N75.0088.4434.7672.5797.5154.92217.92211.24206.97
ei=eo+2095.00108.4454.7692.57117.5174.92237.92231.24226.97
ζ1=0.5fcA/N9.3111.827.665.338.075.146.8810.426.69
l0/h9.179.179.179.179.179.179.179.179.17
ζ21.001.001.001.001.001.001.001.001.00
η1.261.231.451.271.211.331.101.111.11
ηei119.91133.3579.67117.48142.4299.83262.83256.15251.88
eibmin=0.3h0124.50124.50124.50124.50124.50124.50124.50124.50124.50
Nb=ξba1fcbho986.04986.04986.04986.04986.04986.04986.04986.04986.04
判别大小偏心小偏心大偏心小偏心小偏心大偏心小偏心大偏心大偏心大偏心
e=ηei+(h/2-as)309.91269.67307.48289.83
x=N/a1fcb24.1719.0329.3742.2027.8943.7932.7121.5933.62
2as80.0080.0080.0080.0080.0080.0080.0080.0080.00
e'=η
ei-(h/2-as')
-51.65-42.5877.8371.1566.88
ξ1.261.261.371.35
As/As'
按构造
配
按构造
配
按构造
配
按构造
配
按构造
配
按构造
配
按构造
配
按构造
配
按构造
配
0.002bh405.00405.00405.00405.00405.00405.00405.00405.00405.00
选用钢筋3*163*163*163*163*163*163*163*163*16
实配钢筋面积603
整个截面的配筋
率ρ
0.0060.0060.0060.0060.0060.0060.0060.0060.006
备注:
21
2
00
)/()/1400/(11hLhe
i
bcsbccb
bhfaahbhfaNebhfaN
0101
2
0101
/43.0/)(
小偏心受压:)(/)5.01(
0
,2
01
,
sccss
ahfbhfaNeAA
大偏心受压:)(/)2/(,
0
,
01
,
sccss
ahfXhbhfaNeAA
②五层柱:
Z7柱Z8柱Z9柱
b450
h450
h54415
M13.5113.514.6321.0420.4311.2148.6142.1638.77
N197.90197.90255.91332.33251.02364.84217.98176.49241.43
l0=3.3*1.254.134.134.134.134.134.134.134.134.13
e0=M÷N68.2768.2718.0963.3181.3930.73223.00238.88160.58
ei=eo+2088.2788.2738.0983.31101.3950.73243.00258.88180.58
ζ1=0.5fcA/N4.914.913.802.923.872.664.465.514.03
l0/h9.179.179.179.179.179.179.179.179.17
ζ21.001.001.001.001.001.001.001.001.00
η1.281.281.651.301.251.491.101.101.14
ηei113.18113.1863.00108.22126.3075.63267.91283.79205.49
eibmin=0.3h0124.50124.50124.50124.50124.50124.50124.50124.50124.50
Nb=ξba1fcbho986.04986.04986.04986.04986.04986.04986.04986.04986.04
判别大小偏心小偏心小偏心小偏心小偏心大偏心小偏心大偏心大偏心大偏心
e=ηei+(h/2-as)303.18303.18253.00298.22265.63
x=N/a1fcb45.8145.8159.2476.9358.1184.4550.4640.8555.89
2as80.0080.0080.0080.0080.0080.0080.0080.0080.00
e'=η
ei-(h/2-as')
-58.7082.9198.7920.49
ξ1.391.391.370.571.80
As/As'
按构造
配
按构造
配
按构造
配
按构造
配
按构造
配
按构造
配
按构造
配
按构造
配
按构造
配
0.002bh405.00405.00405.00405.00405.00405.00405.00405.00405.00
选用钢筋3*163*163*163*163*163*163*163*163*16
实配钢筋面积603
整个截面的配筋
率ρ
0.0060.0060.0060.0060.0060.0060.0060.0060.006
备注:
21
2
00
)/()/1400/(11hLhe
i
bcsbccb
bhfaahbhfaNebhfaN
0101
2
0101
/43.0/)(
小偏心受压:)(/)5.01(
0
,2
01
,
sccss
ahfbhfaNeAA
大偏心受压:)(/)2/(,
0
,
01
,
sccss
ahfXhbhfaNeAA
③四层柱:
Z7柱Z8柱Z9柱
b450
h450
h54415
M17.7317.7314.1625.8425.8411.2145.6142.2438.75
N285.71285.71355.90426.82426.82581.81289.41210.67290.88
l0=3.3*1.254.134.134.134.134.134.134.134.134.13
e0=M÷N62.0662.0639.7960.5460.5419.27157.60200.50133.22
ei=eo+2082.0682.0659.7980.5480.5439.27177.60220.50153.22
ζ1=0.5fcA/N3.403.402.732.282.281.673.364.613.34
l0/h9.179.179.179.179.179.179.179.179.17
ζ21.001.001.001.001.001.001.001.001.00
η1.301.301.421.311.311.631.141.111.16
ηei106.96106.9684.69105.45105.4564.18202.50245.41178.12
eibmin=0.3h0124.50124.50124.50124.50124.50124.50124.50124.50124.50
Nb=ξba1fcbho986.04986.04986.04986.04986.04986.04986.04986.04986.04
判别大小偏心小偏心小偏心小偏心小偏心小偏心小偏心大偏心大偏心大偏心
e=ηei+(h/2-as)296.96296.96274.69295.45295.45254.18
x=N/a1fcb66.1466.1482.3898.8098.80134.6866.9948.7767.33
2as80.0080.0080.0080.0080.0080.0080.0080.0080.00
e'=η
ei-(h/2-as')
17.5060.41-6.88
ξ1.581.581.702.812.8122.78
As/As'
按构造
配
按构造
配
按构造
配
按构造
配
按构造
配
按构造
配
按构造
配
按构造
配
按构造
配
0.002bh405.00405.00405.00405.00405.00405.00405.00405.00405.00
选用钢筋3*163*163*163*163*163*163*163*163*16
实配钢筋面积603
整个截面的配筋
率ρ
0.0060.0060.0060.0060.0060.0060.0060.0060.006
备注:
21
2
00
)/()/1400/(11hLhe
i
bcsbccb
bhfaahbhfaNebhfaN
0101
2
0101
/43.0/)(
小偏心受压:)(/)5.01(
0
,2
01
,
sccss
ahfbhfaNeAA
大偏心受压:)(/)2/(,
0
,
01
,
sccss
ahfXhbhfaNeAA
④三层柱:
Z7柱Z8柱Z9柱
b450
h450
h54415
M21.814.6119.6930.0530.0511.1450.5045.9349.87
N377.11376.29439.68603.68603.68798.90373.53297.99393.57
l0=3.3*1.254.134.134.134.134.134.134.134.134.13
e0=M÷N57.8312.2544.7849.7849.7813.94135.20154.13126.71
ei=eo+2077.8332.2564.7869.7869.7833.94155.20174.13146.71
ζ1=0.5fcA/N2.582.582.211.611.611.222.603.262.47
l0/h9.179.179.179.179.179.179.179.179.17
ζ21.001.001.001.001.001.001.001.001.00
η1.321.771.381.321.361.651.161.141.17
ηei102.7457.1689.6991.9594.6955.86180.10199.04171.62
eibmin=0.3h0124.50124.50124.50124.50124.50124.50124.50124.50124.50
Nb=ξba1fcbho986.04986.04986.04986.04986.04986.04986.04986.04986.04
判别大小偏心小偏心小偏心小偏心小偏心小偏心小偏心大偏心大偏心大偏心
e=η
ei+(h/2-as)
292.74247.16279.69281.95284.69245.86
x=N/a1fcb87.2987.10101.78139.74139.74184.9386.4768.9891.10
2as80.0080.0080.0080.0080.0080.0080.0080.0080.00
e'=η
ei-(h/2-as')
-4.9014.04-13.38
ξ2.141.632.71-1.06-0.950.18
As/As'
按构造
配
按构造
配
按构造
配
按构造
配
按构造
配
647.55
按构造
配
按构造
配
按构造
配
0.002bh405.00405.00405.00405.00405.00405.00405.00405.00405.00
选用钢筋3*163*163*163*163*163Ф183*163*163*16
实配钢筋面积603
整个截面的配
筋率ρ
0.0060.0060.0060.0060.0060.00380.0060.0060.006
备注:
21
2
00
)/()/1400/(11hLhe
i
bcsbccb
bhfaahbhfaNebhfaN
0101
2
0101
/43.0/)(
小偏心受压:)(/)5.01(
0
,2
01
,
sccss
ahfbhfaNeAA
大偏心受压:)(/)2/(,
0
,
01
,
sccss
ahfXhbhfaNeAA
⑤二层柱:
Z7柱Z8柱Z9柱
b450
h450
h54415
M24.9424.6422.4636.6335.2913.1460.7349.0260.73
N
491.91471.87566.39801.70781.66
1015.8
0499.67387.55499.67
l0=3.3*1.254.134.134.134.134.134.134.134.134.13
e0=M÷N50.7052.2239.6545.6945.1512.94121.54126.49121.54
ei=eo+2070.7072.2259.6565.6965.1532.94141.54146.49141.54
ζ1=0.5fcA/N1.982.061.721.211.240.961.952.511.95
l0/h9.179.179.179.179.179.179.179.179.17
ζ21.001.001.001.001.001.001.001.001.00
η1.351.341.421.271.341.531.141.151.14
ηei95.6197.1384.5683.3887.3250.37161.22169.15160.97
eibmin=0.3h0124.50124.50124.50124.50124.50124.50124.50124.50124.50
Nb=ξba1fcbho986.04986.04986.04986.04986.04986.04986.04986.04986.04
判别大小偏心小偏心小偏心小偏心小偏心小偏心小偏心大偏心大偏心大偏心
e=η
ei+(h/2-as)
285.61287.13274.56273.38277.32240.37
x=N/a1fcb113.87109.23131.11185.58180.94235.14115.6689.71115.66
2as80.0080.0080.0080.0080.0080.0080.0080.0080.00
e'=η
ei-(h/2-as')
-23.78-15.85-24.03
ξ5.704.01-6.210.300.260.58
As/As'
按构造
配
按构造
配
按构造
配
按构造
配
426.52
按构造
配
按构造
配
按构造
配
按构造
配
0.002bh405.00405.00405.00405.00405.00405.00405.00405.00405.00
选用钢筋3*163*163*163*163*163*163*163*163*16
实配钢筋面积603
整个截面的配
筋率ρ
0.0060.0060.0060.0060.0060.0060.0060.0060.006
备注:
21
2
00
)/()/1400/(11hLhe
i
bcsbccb
bhfaahbhfaNebhfaN
0101
2
0101
/43.0/)(
小偏心受压:)(/)5.01(
0
,2
01
,
sccss
ahfbhfaNeAA
大偏心受压:)(/)2/(,
0
,
01
,
sccss
ahfXhbhfaNeAA
⑥一层柱:
Z7柱Z8柱Z9柱
b450
h450
h54415
M43.4334.9037.1751.3545.113.4150.4345.0746.00
N
599.70570.54685.43989.25960.09
1243.2
9509.64480.48617.19
l0=4.5*14.504.504.504.504.504.504.504.504.50
e0=M÷N72.4261.1754.2351.9146.992.7498.9593.8074.53
ei=eo+2092.4281.1774.2371.9166.9922.74118.95113.8094.53
ζ1=0.5fcA/N1.621.701.420.981.010.781.912.021.57
l0/h10.0010.0010.0010.0010.0010.0010.0010.0010.00
ζ21.001.001.001.001.001.001.001.001.00
η1.321.371.341.301.331.761.181.201.20
ηei122.06110.8199.1393.5588.9239.94140.89136.03113.80
eibmin=0.3h0124.50124.50124.50124.50124.50124.50124.50124.50124.50
Nb=ξba1fcbho986.04986.04986.04986.04986.04986.04986.04986.04986.04
判别大小偏心小偏心小偏心小偏心小偏心小偏心小偏心大偏心大偏心小偏心
e=ηei+(h/2-as)312.06300.81289.13283.55278.92229.94303.80
x=N/a1fcb138.82132.07158.66228.99222.24287.80117.97111.22142.87
2as80.0080.0080.0080.0080.0080.0080.0080.0080.00
e'=η
ei-(h/2-as')
-44.11-48.97
ξ-0.38-1.24-0.040.550.530.70-0.37
As/As'
按构造
配
按构造
配
按构造
配
按构造
配
按构造
配
按构造
配
按构造
配
按构造
配
按构造
配
0.002bh405.00405.00405.00405.00405.00405.00405.00405.00405.00
选用钢筋3*163*163*163*163*163*163*163*163*16
实配钢筋面积603
整个截面的配筋
率ρ
0.0060.0060.0060.0060.0060.0060.0060.0060.006
备注:
21
2
00
)/()/1400/(11hLhe
i
bcsbccb
bhfaahbhfaNebhfaN
0101
2
0101
/43.0/)(
小偏心受压:)(/)5.01(
0
,2
01
,
sccss
ahfbhfaNeAA
大偏心受压:)(/)2/(,
0
,
01
,
sccss
ahfXhbhfaNeAA
2.12.6柱斜截面设计:
因为此框架柱为非抗震设防的多层框架柱,其剪力设计值V
c
较小,故只需按构造配置箍筋。且要满足公式
yv
t
svf
f24.0
的要求。
柱取直径为8的双肢箍筋,间距为@200,其实际配箍率为
%125.0
210
1.124.0
%126.0
400200
5.100
'
svsv
,符合要求。
注:梁.柱的配筋图见结施图号图纸.
2.13基础设计
2.13.1基础梁的计算
①JL01的计算:
A、JL01的截面尺寸为mmmm300150
B、荷载的计算:a、上部墙体传来的荷载:
mkN/94.9202)3.03.3(012.02.119)3.03.0(12.02.1
b、梁自重:mkN/35.1253.015.02.1
合计:mkNg/42.1335.194.9
C、内力计算:a、跨中弯矩为:
mkNqlM23.127.242.138/18/122
故选用142ρ=%2.0%684.0300150/308(符合要求)
b、梁端剪力为:kNqlV12.187.242.132/12/1
mmh27525300
0
故VkNbhf
c
76.372751501.17.07.0
0
所以该梁只需要按构造配筋,选用200@6的双肢箍筋,其配箍率为
ρ
%126.0210/1.124.0/24.0%189.0200150/6.56
sv
yvt
ff(符合要求)
②JL02的计算:
A、JL02的截面尺寸为mmmm300150
B、荷载的计算:a、上部墙体传来的荷载:
mkN/94.9202)3.03.3(012.02.119)3.03.0(12.02.1
b、梁自重:mkN/35.1253.015.02.1
合计:mkNg/42.1335.194.9
C、内力计算:a、跨中弯矩为:
mkNqlM42.22.142.138/18/122
故选用142ρ=%2.0%684.0300150/308(符合要求)
b、梁端剪力为:kNqlV05.82.142.132/12/1
mmh27525300
0
故
VkNbhf
c
76.372751501.17.07.0
0
所以该梁只需要按构造配筋,选用200@6的双肢箍筋,其配箍率为
ρ
%126.0210/1.124.0/24.0%189.0200150/6.56
sv
yvt
ff
(符合要求)
③JL03的计算:
A、JL03的截面尺寸为mmmm300150
B、荷载的计算:a、上部墙体传来的荷载:
mkN/94.9202)3.03.3(012.02.119)3.03.0(12.02.1
b、梁自重:mkN/35.1253.015.02.1
合计:mkNg/42.1335.194.9
C、内力计算:a、跨中弯矩为:mkNqlM40.71.242.138/18/122
故选用142ρ=%2.0%684.0300150/308(符合要求)
b、梁端剪力为:kNqlV77.71.242.132/12/1
mmh27525300
0
故
VkNbhf
c
76.372751501.17.07.0
0
所以该梁只需要按构造配筋,选用200@6的双肢箍筋,其配箍率为
ρ
%126.0210/1.124.0/24.0%189.0200150/6.56
sv
yvt
ff
(符合要求)
④JL04的计算:
A、JL04的截面尺寸为mmmm400200
B、荷载的计算:a、上部墙体传来的荷载:
mkN/57.13202)4.03.3(012.02.119)4.03.0(18.02.1
b、梁自重:mkN/4.2254.02.02.1
合计:mkNg/97.154.257.13
C、内力计算:a、跨中弯矩为:
mkNqlM99.458.497.158/18/122
故选用143ρ=%2.0%576.0400200/461(符合要求)
b、梁端剪力为:kNqlV83.388.497.152/12/1
mmh37525400
0
故
VkNbhf
c
75.573752001.17.07.0
0
所以该梁只需要按构造配筋,选用200@6的双肢箍筋,其配箍率为
ρ
%126.0210/1.124.0/24.0%189.0200150/6.56
sv
yvt
ff
(符合要求)
⑤JL05的计算:
A、JL05的截面尺寸为mmmm400200
B、荷载的计算:a、上部墙体传来的荷载:
mkN/91.420205.1012.02.11905.118.02.1
b、梁自重:mkN/4.2254.02.02.1
合计:mkNg/31.74.291.4
C、内力计算:a、跨中弯矩为:
mkNqlM90.139.331.78/18/122
故选用142ρ=%2.0%385.0400200/308(符合要求)
b、梁端剪力为:kNqlV25.149.331.72/12/1
mmh37525400
0
故
VkNbhf
c
75.573752001.17.07.0
0
所以该梁只需要按构造配筋,选用200@6的双肢箍筋,其配箍率为
ρ
%126.0210/1.124.0/24.0%189.0200150/6.56
sv
yvt
ff
(符合要求)
⑥JL06的计算:
A、JL06的截面尺寸为mmmm400200
B、荷载的计算:a、上部墙体传来的荷载:
mkN/60.9202)4.03.3(012.02.119)4.03.3(12.02.1
b、梁自重:mkN/4.2254.02.02.1
c、JL01传来的集中力:kNV06.9
d、JL02传来的集中力:kNV03.4
合计:mkNg/31.74.291.4
C、内力计算
a、求支痤反力:kNF
B
59.302.4/)1.206.99.003.41.22.412(
kNF
A
90.3259.3006.903.42.412
b、求1、2点的弯矩:mkNM75.2445.09.0129.090.32
1
mkNM26.4405.11.206.91.259.30
2
c、故选用143ρ=%2.0%576.0400200/461(符合要求)
d、梁端剪力为:kNV59.30和kNV90.32故取大者kNV90.32
mmh37525400
0
故
VkNbhf
c
75.573752001.17.07.0
0
所以该梁只需要按构造配筋,选用200@6的双肢箍筋,其配箍率为
ρ
%126.0210/1.124.0/24.0%189.0200150/6.56
sv
yvt
ff
(符合要求)
⑦JL07的计算:
A、JL07的截面尺寸为mmmm300150
B、荷载的计算:a、上部墙体传来的荷载:
mkN/94.9202)3.03.3(012.02.119)3.03.3(12.02.1
b、梁自重:mkN/35.1253.015.02.1
c、JL03传来的集中力:kNV89.3
合计:mkNg/42.1335.194.9
C、内力计算
a、求支痤反力:kNF
B
05.184.2/)2.189.32.14.240.13(
kNF
A
05.1805.1889.34.242.13
b、求1、2点的弯矩:mkNM86.186.02.189.32.105.18
1
c、故选用142ρ=%2.0%684.0300150/308(符合要求)
d、梁端剪力为:kNV05.18
mmh27525300
0
故
VkNbhf
c
76.372751501.17.07.0
0
所以该梁只需要按构造配筋,选用200@6的双肢箍筋,其配箍率为
ρ
%126.0210/1.124.0/24.0%189.0200150/6.56
sv
yvt
ff
(符合要求)
⑧JL08的计算:
A、JL078的截面尺寸为mmmm400200
B、荷载的计算:a、上部墙体传来的荷载:
mkN/60.9202)4.03.3(012.02.119)4.03.3(12.02.1
b、梁自重:mkN/4.2254.02.02.1
c、JL03传来的集中力:kNV05.18
合计:mkNg/124.260.9
C、内力计算
a、求支痤反力:kNF
B
23.342.4/)1.205.181.22.412(
kNF
A
23.3423.3405.182.412
b、求1、2点的弯矩:mkNM42.4505.11.21212.223.34
1
c、故选用143ρ=%2.0%576.0400200/461(符合要求)
d、梁端剪力为:kNV23.34
mmh37525400
0
故
VkNbhf
c
75.573752001.17.07.0
0
所以该梁只需要按构造配筋,选用200@6的双肢箍筋,其配箍率为
ρ
%126.0210/1.124.0/24.0%189.0200150/6.56
sv
yvt
ff
(符合要求)
⑨横向基础梁的计算:
A、荷载的计算:
a、JPL01:
上部墙体传来的荷载:mkN/91.420205.1012.02.11905.118.02.1
梁自重:mkN/75.3255.025.02.1
合计:mkNg/66.875.391.4
JL05传来的集中力:kNV13.7
b、JKL08:
上部墙体传来的荷载:mkN/12202)5.03.3(012.02.119)5.03.3(12.02.1
梁自重:mkN/75.3255.025.02.1
合计:mkNg/75.1575.312
JL06传来的集中力:kNV59.30
c、JKL03:
上部墙体传来的荷载:mkN/12202)5.03.3(012.02.119)5.03.3(12.02.1
梁自重:mkN/75.3255.025.02.1
合计:mkNg/75.1575.312
JL08传来的集中力:kNV23.34
⑩纵向基础梁的计算:
A、荷载的计算:
a、JKL13:
上部墙体传来的荷载:mkN/12202)5.03.3(012.02.119)5.03.3(12.02.1
梁自重:mkN/75.3255.025.02.1
合计:mkNg/75.1575.312
b、JKL16:
上部墙体传来的荷载:mkN/12202)5.03.3(012.02.119)5.03.3(12.02.1
梁自重:mkN/75.3255.025.02.1
合计:mkNg/75.1575.312
JL02传来的集中力:kNV03.4
JL07传来的集中力:kNV05.18
c、JKL19:
上部墙体传来的荷载:mkN/12202)5.03.3(012.02.119)5.03.3(12.02.1
梁自重:mkN/75.3255.025.02.1
合计:mkNg/75.1575.312
d、JKL22:
上部墙体传来的荷载:mkN/12202)5.03.3(012.02.119)5.03.3(12.02.1
梁自重:mkN/75.3255.025.02.1
合计:mkNg/75.1575.312
JL04传来的集中力:kNV42.19